[Vung Tau] Phu My 3 Industrial Park

May 19, 2025

Overview of Phu My 3 Industrial Park project

Phu My 3 Industrial Park is one of two Model Industrial Park projects included in the Cooperation & Development Agreement signed between Vietnamese Prime Minister Nguyen Tan Dung and Japanese Prime Minister Yoshihiko Noda in November 2011.

Project name: Phu My 3 Industrial Park (PM3 SIP)

Location: Phuoc Hoa Ward, Phu My Town, Ba Ria – Vung Tau Province.

Investor: Thanh Binh Phu My Joint Stock Company

Scale: 999 ha

Industrial park land phase 1: 376 ha
Industrial park land phase 2: 506 ha
Residential land & Golf course: 117 ha

Starting time: August 2015

Project operation time: December 20, 2077

Phối cảnh dự án Khu công nghiệp Phú Mỹ 3

Perspective of Phu My 3 Industrial Park project

Video introducing Phu My 3 Industrial Park project

Location of Phu My 3 Industrial Park

Phu My 3 Industrial Park (PM3 SIP) owns a strategic location in Phu My town, Ba Ria – Vung Tau province, located in the Southern Corridor Economic Zone of Southeast Asia and the Southern Key Economic Zone of Vietnam.

Convenient connection to key transport networks:

Distance to Southern Economic Centers

  • Ho Chi Minh City: 60 km
  • Vung Tau City: 35 km
  • Bien Hoa City: 50 km
  • Binh Duong City: 60 km
Road:
  • National Highway 51: 500 m
  • National Highway 1A: 56 km
  • Ho Chi Minh – Long Thanh – Dau Giay Expressway: 30 km

Airport:

  • Tan Son Nhat Airport: 65 km
  • Long Thanh International Airport: 30 km (expected to be operational: 2020)

Waterway:

  • Thi Vai-Cai Mep deep-water seaport system: 4 km (80,000-120,000 DWT)
  • Phu My 3 Port: located in the Industrial Park (1,000-5,000 DWT)

Vị trí chiến lược của KCN Phú Mỹ 3

Strategic location of Phu My 3 Industrial Park

Infrastructure of Phu My 3 Industrial Park

Power system:

  • Stable power supply is provided from Phu My Thermal Power Plant and Ba Ria Thermal Power Plant by Vietnam Electricity Group (EVN), with a total capacity of 4,100 MW.
  • 22Kv voltage is supplied to the customer’s fence in Phu My 3 Industrial Park by underground cable system.

Trạm điện tại KCN Chuyên sâu Phú Mỹ 3

Power station at Phu My 3 Specialized Industrial Park

Water supply system:

Supplier: Phu My Water Supply Joint Stock Company (Wasuco)

Capacity:

  • 90,000 – 100,000 m3/day
  • Can be upgraded based on customer requirements.

Nhà máy cung cấp nước KCN Phú Mỹ 3

Phu My 3 Industrial Park Water Supply Plant

Wastewater treatment plant:

The centralized wastewater treatment plant of Phu My 3 Industrial Park was designed and built by Kobelco Eco-Solutions, capable of treating wastewater to the strictest and first column A standards in Ba Ria Vung Tau province with a capacity of 45,000m3/day and night.

Nhà máy xử lý nước thải KCN Phú Mỹ 3

Phu My 3 Industrial Park Wastewater Treatment Plant

Gas Station

  • Condensate and LPG are supplied from Dinh Co Gas Processing Plant to Thi Vai LPG warehouse by pipeline through Phu My 3 Specialized Industrial Park next to the automatic gas pipeline running parallel to the Phu My 3 Industrial Park boundary from the Nam Con Son / Bach Ho gas pipeline system.
  • Natural Gas (NG) & Liquefied Petroleum Gas (LPG) are managed and distributed to customers in Phu My 3 Industrial Park by Sojitz Osaka Gas Energy Co., Ltd. via 6-inch gas pipeline with a maximum capacity of up to 15 million m3 of gas per month.

Phu My IDC

  • With an area of ​​about 37.8ha, including 6 wharves. Phu My 3 IDC will be an extension of Cai Mep – Thi Vai deep-water port.
  • Phu My 3 IDC provides services: transshipment, warehousing, storage, loading and unloading, customs clearance of goods… contributing to shortening the time of goods release, maximizing logistics costs, optimizing production for businesses in Phu My 3 specialized industrial park and neighboring areas.

Cai Mep Thi Vai International Deep Sea Port System

  • With a navigation channel depth of -14m ~ -16.5m, it can receive ships up to 200,000 DWT to dock for cargo. Cai Mep – Thi Vai international deep-water port has full shipping routes directly to Europe, America, and Intra-Asia, helping to minimize costs and time for transporting goods, optimizing production.

Current status of land use planning of Phu My 3 Industrial Park

Total industrial park land area: 882 ha

Total industrial park land area for lease: 647 ha

Phase 1:

  • Industrial park land area 376 ha
  • Industrial park land area for lease: 286 ha
  • Industrial park land area for lease: 150 ha
    Occupancy rate 52%

Phase 2:

  • Industrial park land area 506 ha
  • Industrial park land area for lease: 361 ha

Bản đồ quy hoạch dự án KCN Phú Mỹ 3

Phu My 3 Industrial Park Project Planning Map

Priority areas for investment attraction

  • Heavy industry: Petrochemicals, Basic materials, Chemicals, Construction materials, Metallurgy, Mechanical engineering, others…
  • Multi-industry: Supporting industry, Textiles, footwear, Consumer goods, Medical equipment, Pharmaceuticals, …
  • Ports and logistics services: Cargo handling and counting services, Container transit, Repair and maintenance, Warehousing, Bonded warehouse, Transportation, …
  • High technology: Information technology, Automation technology, Manufacturing technology, Production technology, …

Investment incentives policy

Corporate income tax

  • 17% on taxable income for the first 10 years from the year of revenue generation.
  • Tax exemption for the first 2 years from the year of taxable income generation, and 50% reduction for the next 4 years.

Exemption from import tax as follows

  • Exemption from import tax on machinery and equipment for the petroleum and gas industry.
  • Exemption from import tax on machinery and equipment used to create fixed assets for investment projects.
  • Exemption from import tax on machinery and equipment that cannot be produced domestically.

Chính sách ưu đãi đầu tư tại KCN Phũ Mỹ 3

Investment incentives policy at Phu My 3 Industrial Park

Planning map of Phu My 3 Industrial Park

Download high quality file of industrial park planning:Link

Evaluation of Phu My 3 Specialized Industrial Park project

With a strategic location 2 km from Cai Mep Thi Vai Deepwater Port, combined with a synchronous, modern, international-standard infrastructure, Phu My 3 Specialized Industrial Park is an ideal investment place for investors.

The complete and perfect utility system of the industrial park helps facilitate the production and business activities of customers and investors.

Extremely good incentive policies for investors and land lease terms of up to 70 years are what attract many interested investors.

One-stop service supports investors with quick and convenient procedures.

Services of Vietnam Property Hub

With a team of staff with many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub provides the following services:
  • Investment promotion (land, factories) in industrial parks, industrial clusters and commercial service land, …
  • Legal support & Investment consulting in areas related to industrial real estate.
  • Connecting and cooperating in industrial real estate investment.

Contact consultant


富美3工​​业园区项目概况

Phu My 3 Industrial Park 是2011年11月越南总理阮晋勇与日本首相野田佳彦签署的合作与发展协议中两个示范工业园区项目之一。

项目名称: Phu My 3 Industrial Park (PM3 SIP)

地点:头顿省巴地市富美镇福和区。

投资者:Thanh Binh Phu My 股份公司

规模:999公顷

工业园区一期用地:376公顷
工业园区二期用地:506公顷
住宅用地及高尔夫球场:117公顷

启动时间:2015年8月

项目运行时间:2077年12月20日

Phối cảnh dự án Khu công nghiệp Phú Mỹ 3

富美3工​​业园区项目前景

富美3工​​业园区项目介绍视频

富美3工​​业园区位置

Phu My 3 Industrial Park (PM3 SIP) 公司位于巴地头顿省富美镇,地理位置优越,地处东南亚南部经济走廊和越南南部重点经济区。

便捷的交通连接:

距离南部经济中心:

胡志明市:60 公里
头顿市:35 公里
边和市:50 公里
平阳市:60 公里

公路:
51号国道:500米
1A号国道:56公里
胡志明-隆城-油桥高速公路:30公里

机场:

新山一机场:65公里
隆城国际机场:30公里(预计2020年投入运营)

水路:

氏威-蔡梅深水港系统:4公里(8万-12万载重吨)
富美3港:位于工业园区内(1000-5000载重吨)

Vị trí chiến lược của KCN Phú Mỹ 3

富美3工​​业园区的战略位置

富美3工​​业园区基础设施

电力系统:

越南电力集团(EVN)旗下的富美火电厂和巴地火电厂为电力供应稳定,总装机容量达4100兆瓦。
富美3工业园区的22千伏电压通过地下电缆系统输送至用户围栏。

Trạm điện tại KCN Chuyên sâu Phú Mỹ 3

富美3专业工业园区发电站

供水系统:

供应商:富美供水股份公司 (Wasuco)

容量:

90,000 – 100,000 立方米/天
可根据客户需求升级。

Nhà máy cung cấp nước KCN Phú Mỹ 3

富美3工​​业园区供水厂

污水处理厂:

富美3工业园区的集中式污水处理厂由神钢生态解决方案公司设计和建造,能够按照巴地头顿省最严格、一级A级标准处理污水,日处理能力为45,000立方米/天。

Nhà máy xử lý nước thải KCN Phú Mỹ 3

富美3工​​业园区污水处理厂

加气站

  • 凝析油和液化石油气 (LPG) 由丁古天然气加工厂通过管道输送至氏威 (Thi Vai) 液化石油气仓库,该仓库位于富美3专业工业园区旁,毗邻与富美3工业园区边界平行的自动化天然气管道,由南昆山/白湖天然气管道系统输送。
  • 天然气 (NG) 和液化石油气 (LPG) 由双日大阪燃气能源有限公司 (Sojitz Osaka Gas Energy Co. Ltd.) 通过 6 英寸管道进行管理和配送,输送至富美3工业园区的客户,每月最大输送量可达 1500 万立方米。

富美数据中心

  • 富美3工​​业园区占地约37.8公顷,包含6个码头。该园区将成为盖梅-氏威深水港的延伸。
  • 富美3工业园区提供转运、仓储、保管、装卸、货物清关等服务,有助于缩短货物放行时间,最大限度地降低物流成本,优化富美3专业工业园区及周边地区企业的生产。

盖梅氏威国际深水港系统

  • 航道水深-14米~-16.5米,可停靠20万吨级船舶,拥有直达欧洲、美洲、亚洲地区的全航线,有助于最大程度地降低货物运输成本和时间,优化生产。

富美3工​​业园区土地利用规划现状

工业园区总土地面积:882公顷

工业园区可出租土地总面积:647公顷

一期:

工业园区用地面积:376公顷
工业园区可出租土地面积:286公顷
工业园区可出租土地面积:150公顷
出租率:52%

二期:

工业园区用地面积:506公顷
工业园区可出租用地面积:361公顷

Bản đồ quy hoạch dự án KCN Phú Mỹ 3

Phu My 3 Industrial Park Project Planning Map

招商引资重点领域

  • 重工业:石油化工、基础材料、化工、建筑材料、冶金、机械工程等……
    多行业:辅助工业、纺织、鞋类、消费品、医疗器械、制药等
    港口和物流服务:货物装卸和计数服务、集装箱中转、维修和保养、仓储、保税仓库、交通运输等
    高科技:信息技术、自动化技术、制造技术、生产技术等

投资激励政策

企业所得税

自产生收入年度起,前10年按应税收入的17%征收企业所得税。
自产生应税收入年度起,前2年免税,后4年减半征收。

免征以下进口税

  • 免征石油天然气工业用机械设备进口税。
  • 免征用于投资项目固定资产建设的机械设备进口税。
  • 免征国内无法生产的机械设备进口税。

Chính sách ưu đãi đầu tư tại KCN Phũ Mỹ 3

富美3工​​业园区投资激励政策

富美3工​​业园区规划图

Download high quality file of industrial park planning:Link

富美3专业工业园区项目评估

富美3专业工业园区地理位置优越,距离盖梅氏威深水港仅2公里,并配备与时俱进的现代化国际标准基础设施,是投资者的理想投资地。

工业园区配套完善的公共设施系统,为客户和投资者的生产经营活动提供了便利。

极其优厚的投资者激励政策以及长达70年的土地租赁期限,吸引了众多有意向的投资者。

一站式服务为投资者提供快捷便利的手续。

越南房地产中心的服务

越南房地产中心拥有一支在项目投资实施领域拥有多年经验的员工队伍,与工业园区管理委员会、项目投资者合作,为众多国内外投资者提供服务,提供以下服务:
  • 工业园区、产业集群和商业服务用地的招商引资(土地、工厂)……
  • 工业地产相关领域的法律支持和投资咨询。
  • 工业地产投资对接与合作。

联系顾问

Helen
Property Investment & Advisory Manager 15 years experience
Kater
Industrial Property
Consultant
5 years experience