Phu My 2 Industrial Park Expansion, Phu My Town, Ba Ria – Vung Tau Province has a very favorable location for waterway and road traffic, located in an area with import-export activities through the most vibrant seaport system in Vietnam.
Project name: Phu My 2 Industrial Park Expansion
Location: Phu My Town, Ba Ria-Vung Tau Province
Investor: IDICO Corporation (Vietnam Urban and Industrial Zone Development Investment Corporation)
Scale: 400.87 ha.
Construction start date: 2008
Project operation period: until July 25, 2058
Entrance gate to Phu My 2 Industrial Park Expansion project
Phu My 2 IDICO Industrial Park expansion is located in Phu My, Phuoc Tan and Phuoc Hoa Wards – Phu My Town – Ba Ria – Vung Tau Province:
Location of Phu My 2 Industrial Park expansion
Road distance:
National Highway 51: 1.5Km
Ho Chi Minh City – Long Thanh – Dau Giay Expressway: 30Km
Vung Tau City: 40Km
Ho Chi Minh City: 60Km
Bien Hoa City: 55Km
Distance to the port:
Thi Vai Port (for 80,000-ton ships): 01Km
PTSC Port (for 60,000-ton ships): 02Km
Phu My Port (for 72,000-ton ships): 02Km
Vung Tau Port: 35Km
Distance to the airport:
Tan Son Nhat Airport: 70Km
Long Thanh Airport (future): 35Km
Distance to the railway station:
Saigon Station: 65Km
Bien Hoa Station: 60Km
Power supply of Phu My 2 Industrial Park expansion:
Power source: From the national grid managed by Phu My Town Electricity/Ba Ria – Vung Tau Province Electricity.
Voltage supply for factories: 22kV
Clean water supply of Phu My 2 Industrial Park expansion:
Source: Toc Tien Water Plant, capacity 50,000m3/day and night;
Clean water is supplied to the foot of the Factory fence;
Communication information of Phu My 2 Industrial Park expansion:
The communication system is provided by network operators such as: VNPT, FPT, Viettel… ensuring smooth communication domestically and internationally. Including full services such as: telephone, mobile phone, Fax, Internet…
Drainage of Phu My 2 Industrial Park expansion:
The industrial park has a rainwater drainage and wastewater drainage system, built separately, along internal roads. Rainwater is drained directly into the receiving source; Wastewater is collected at the industrial park’s centralized wastewater treatment plant and treated to meet required standards before being discharged into the environment.
Wastewater treatment of Phu My 2 Industrial Park expansion:
The centralized wastewater treatment plant in the industrial park has been completed, receiving industrial wastewater from the factory fence.
Phase 1 capacity: 4,000 m3/day and night.
Internal traffic of Phu My 2 Industrial Park expansion:
The industrial park has a complete internal traffic system, invested in and built with good quality to ensure that vehicles can circulate. Including main road systems such as D3 road and the fishbone road system connecting to the factory gates.
D3 main road axis, cross-section 63m, road section for vehicles 24m, median strip 3m;
Internal branch roads: 2 lanes, 8m wide.
Internal road of Phu My 2 Industrial Park expansion
Total planning area: 398.06 ha
Land for construction of factories and plants: 241.39 ha
Warehouse land: 9.14 ha
Land for construction of operations and services: 1.97 ha
Land for trees and water surface: 85.91 ha
Land for traffic and ports: 50.23 ha
Land for construction of technical infrastructure works: 9.42 ha
Production of industrial and specialized electronic equipment
Production of components, parts, accessories
Production of electronic materials, consumer electronic products
Mechanical engineering for manufacturing spare parts
Mechanical assembly industry
Mechanical repair industry
Metallurgy, rolling, post-rolling products
Production of consumer chemicals, cosmetics, industry
Production of fertilizers, microbiological pesticides
Textile and textile industry
Production of high-quality footwear and leather
Plastic industry
Ceramic, porcelain, glass industry
Corporate income tax rate: 20%
Tax incentives:
The preferential tax rate is 17% for 10 consecutive years from the first year the enterprise has revenue from the project. After the period of application of this preferential tax rate, the enterprise switches to applying the tax rate of 20%.
Tax exemption for 2 years and 50% reduction for the next 4 years from the time of taxable income.
The tax exemption and reduction period is calculated continuously from the first year the enterprise has taxable income from the project;
In case the enterprise has no taxable income in the first three years (from the first year of revenue from the project), the tax exemption and reduction period is calculated from the fourth year.
Basis for determining tax incentives: Decree No. 218/2013/ND-CP dated December 26, 2013; No. 118/2015/ND-CP dated November 12, 2015.
Import tax: Enterprises are exempted from import tax on imported goods according to the provisions of Article 16 of the Law on Export Tax and Import Tax No. 45/2005/QH11 dated June 14, 2005 and Article 12 of Decree No. 87/2010/ND-CP dated August 13, 2010 of the Government detailing the implementation of a number of articles of the Law on Export Tax and Import Tax.
Download high quality file of industrial park planning map: Link
IDICO Phu My 2 Industrial Park is near Cai Mep Port, Phu My Port, SP-SPA International Port, SITV Port…; the Ports can receive large tonnage ships (80,000DWT to over 200,000DWT), located on the most important and bustling international shipping route in the region and the world, with cargo handling equipment, modern warehouse systems, and are put into operation by major shipping lines in the world. This is a huge advantage of Phu My 2 Industrial Park, helping investors save a lot of transportation and logistics costs…
IDICO Phu My 2 Industrial Park has natural gas to serve investors in need, which is a huge advantage that not all industrial parks have.
IDICO Phu My 2 Industrial Park has good land rental prices, very competitive compared to neighboring industrial parks.
IDICO Phu My 2 Industrial Park expansion has an inland port system located in the Industrial Park that can receive ships and barges up to 3,000 tons. Convenient for transporting raw materials and goods domestically and within the region.
IDICO Phu My 2 Industrial Park expansion has land for projects requiring large areas.
IDICO Phu My 2 Industrial Park expansion has a wastewater treatment plant in operation with a designed capacity of 4,000m3/day and night.
IDICO Phu My 2 Industrial Park expansion has Route 965 running through it, connecting to Highway 51, which is a vital route connecting to the Southeast provinces and the Southern Key Economic Zone; Located next to the inter-port route, connecting the port system along the Thi Vai – Cai Mep River. These routes have been fully invested to serve the needs of trade, transportation, raw materials, goods, etc.
The expanded Phu My 2 Industrial Park IDICO has a complete technical infrastructure system that has been planned and invested in synchronous construction including internal traffic system, power supply system, water supply, rainwater drainage, wastewater, wastewater treatment, the expanded Phu My 2 Industrial Park is a destination that converges all the most favorable conditions ready to welcome and cooperate with investors who have the need to invest in building factories here.
巴地头顿省富美镇富美二号工业园区扩建项目地理位置优越,水路和陆路交通便利,地处越南最活跃的海港系统进出口贸易区。
项目名称:富美二号工业园区扩建项目
地点:巴地头顿省富美镇
投资方:IDICO集团(越南城市和工业区发展投资公司)
规模:400.87公顷
开工日期:2008年
项目运营期限:至2058年7月25日
富美2工业园区扩建项目入口大门
富美2 IDICO工业园区扩建项目位于头顿省巴地市富美镇富美坊、福新坊和福和坊。
北:毗邻富美2 IDICO工业园区、965号公路及相关项目;
东:毗邻富美新城市技术走廊;
南:毗邻福和-盖梅规划路;
西:毗邻盖梅工业园区。
富美2工业园区扩建项目位置
公路距离:
51号国道:1.5公里
胡志明市 – 隆城 – 油桥高速公路:30公里
头顿市:40公里
胡志明市:60公里
边和市:55公里
距离港口:
氏威港(8万吨级船舶停靠):1公里
PTSC港(6万吨级船舶停靠):2公里
富美港(7.2万吨级船舶停靠):2公里
头顿港:35公里
距离机场:
新山一机场:70公里
隆城机场(规划中):35公里
距离火车站:
西贡站:65公里
边和站:60公里
富美2工业园区扩建工程的电力供应:
电源:来自富美镇电力公司/巴地头顿省电力公司管理的国家电网。
工厂供电电压:22千伏
富美2工业园区扩建工程的净水供应:
水源:Toc Tien水厂,日均供水量5万立方米;
净水供应至工厂围墙脚下;
富美2工业园区扩建工程的通讯信息:
通讯系统由VNPT、FPT、Viettel等网络运营商提供,确保国内外通讯畅通。提供电话、手机、传真、互联网等全方位服务。
富美2工业园区扩建工程的排水系统:
工业园区设有雨水和废水排放系统,分别沿内部道路设置。雨水直接排入污水源;废水经工业园区集中污水处理厂收集,处理达标后排放。
富美2工业园区扩建项目污水处理:
工业园区集中污水处理厂已建成,接收来自工厂围墙的工业废水。
一期处理能力:4000立方米/日夜。
富美2工业园区扩建项目内部交通:
工业园区拥有完善的内部交通系统,投资建设并质量优良,确保车辆畅通无阻。包括D3公路等主干道系统以及连接工厂大门的鱼骨路系统。
D3主干道轴线,横断面63米,车行道24米,中央隔离带3米;
内部支路:双车道,宽8米。
富美2工业园区扩建项目内部道路
总规划面积:398.06公顷
厂房建设用地:241.39公顷
仓库用地:9.14公顷
运营及服务建设用地:1.97公顷
林地及水面用地:85.91公顷
交通及港口用地:50.23公顷
技术基础设施建设用地:9.42公顷
工业和专用电子设备生产
零部件、部件和配件生产
电子材料、消费电子产品生产
机械工程备件制造
机械装配行业
机械修理行业
冶金、轧制、轧后产品
消费化学品、化妆品、工业生产
肥料、微生物农药生产
纺织和纺织工业
高品质鞋类和皮革生产
塑料工业
陶瓷、瓷器、玻璃工业
企业所得税税率:20%
税收优惠:
自企业从项目获得第一年收入起,连续10年享受17%的优惠税率。优惠税率适用期满后,企业可转为适用20%的税率。
自企业获得应税收入之日起,享受2年免税,之后4年减半征收。
免税、减税期自企业从项目获得第一年收入起连续计算;
如果企业在前三年(自项目获得第一年收入起)没有获得应税收入,则免税、减税期从第四年开始计算。
确定税收优惠的依据:2013年12月26日第218/2013/ND-CP号法令; 2015年11月12日第118/2015/ND-CP号政府令。
进口税:根据2005年6月14日第45/2005/QH11号政府令《进出口税法》第16条和2010年8月13日第87/2010/ND-CP号政府令《关于实施进出口税法若干条款的通知》第12条规定,企业进口货物免征进口税。
工业园区规划图高清文件下载:: Link
IDICO富美2工业园区毗邻盖梅港、富美港、SP-SPA国际港、SITV港等;这些港口可停靠大型船舶(8万载重吨至20万载重吨以上),位于该地区乃至全球最重要、最繁忙的国际航线上,配备货物装卸设备和现代化的仓储系统,并由世界主要航运公司运营。这是富美2工业园区的一大优势,可帮助投资者节省大量运输和物流成本……
IDICO富美2工业园区拥有天然气资源,可为有需求的投资者提供服务,这是并非所有工业园区都具备的巨大优势。
IDICO富美2工业园区拥有优惠的土地租赁价格,与周边工业园区相比极具竞争力。
IDICO富美2工业园区扩建项目在园区内拥有一个内陆港口系统,可停靠3000吨级的船舶和驳船。方便国内和区域内原材料和货物的运输。
IDICO富美2工业园区扩建项目拥有大面积项目所需的土地。
IDICO富美2工业园区扩建项目拥有一座污水处理厂,设计处理能力为4000立方米/天/夜。
IDICO富美2工业园区扩建项目穿过965号公路,连接51号高速公路,是连接东南各省和南部重点经济区的要道;毗邻港内通道,连接了氏威河-盖梅河沿岸的港口系统。这些路线已全面投入,以满足贸易、运输、原材料、货物等需求。
扩建后的富美2工业园区IDICO拥有完整的技术基础设施体系,已规划并同步投资建设,包括内部交通系统、供电系统、供水系统、雨水排放系统、污水处理系统和污水处理厂。扩建后的富美2工业园区汇聚了所有最有利的条件,随时欢迎有意愿在此投资建厂的投资者前来合作。