Overview of VSIP Nghe An Industrial Park project

May 17, 2025

Overview of VSIP Nghe An Industrial Park project

VSIP Nghe An Industrial Park is a new, leading modern industrial park in Nghe An province, attracting investors to Nghe An province in particular and the North Central provinces in general.
The project is planned according to Decision No. 5441/QD-UBND dated November 9, 2017 of Nghe An Provincial People’s Committee. VSIP Nghe An Industrial Park is located in Hung Nguyen district, Nghe An province with a planned area of ​​750 hectares, of which Phase 1 is 226 hectares (83 hectares of commercial and service land).

Project name: VSIP Nghe An Industrial Park

Location: Hung Nguyen district, Nghe An province

Investor: VSIP Nghe An Company Limited

Scale: 750 hectares

Construction start date: 2017

Project operation period: Until 2067

Phối cảnh dự án Khu công nghiệp VSIP Nghệ An

VSIP Nghe An project perspective

Location VSIP Nghe An Industrial Park

VSIP Nghe An is located in Hung Tay commune, Hung Dao commune, Hung Nguyen town – Hung Nguyen district and Hung Chinh commune – Vinh city.

The industrial park is located in a prime location, connecting with many key traffic routes such as National Highway 1A, National Highway 46A, National Highway 46B and Vinh – Cua Lo Boulevard. The industrial park has a convenient traffic connection system, ensuring access to sea, road, rail, air, …

  • 3km from Vinh city;
  • 270km from Hanoi city;
  • 80km from Thanh Thuy border gate (bordering Laos);
  • 15km from Cua Lo seaport;
  • 4km from Vissai seaport;
  • 6km from Vinh station;
  • 4km from Vinh international airport.

Vị trí Khu công nghiệp VSIP Nghệ An

VSIP Nghe An location

Project location on Google Map: Link

VSIP Nghe An Industrial Park Infrastructure

Traffic system: built spaciously and modernly with main roads and branch roads. The road surface is designed with a width of 27.31 meters and 38 meters, ensuring that container trucks can access each plot of land in the industrial park, convenient for transporting goods in and out of the industrial park.

Hạ tâng giao thông Khu công nghiệp VSIP Nghệ An

VSIP Nghe An traffic infrastructure

Power system: the industrial park’s power is supplied by Vietnam Electricity Group, 2x63MVA-110/35/22kV power station and 110kV line connected from Hung Dong station.

Trạm biến áp KCN VSIP Nghệ An

VSIP Nghe An Industrial Park Transformer Station

Water source: The water source produced in the Industrial Park is guaranteed by the internal clean water treatment and supply plant.

Wastewater treatment system: The wastewater treatment plant has a capacity of 6,000m³. It is expected that when completed, the wastewater treatment plant will reach a treatment capacity of 28,000m³/day and night, meeting the wastewater treatment needs for the entire 750ha of the project.

Nhà máy xử lý nước thải VSIP Nghệ An

VSIP Nghe An Wastewater Treatment Plant

Telecommunication/Internet services: The switchboard has a total of 8,000 numbers, with 3,000 lines ensuring telecommunication and Internet service connection to each plot of land in the industrial park.

Fire prevention and fighting station: The fire prevention and fighting system meets national standards, fire hydrants are arranged along the Industrial Park road axis (about 100-120m/hydrant) to ensure fire prevention and fighting in case of an incident.

Trạm phòng cháy chữa cháy VSIP Nghệ An

VSIP Nghe An Fire Prevention and Fighting Station

Security system and technical staff: VSIP Hai Duong Industrial Park is equipped with a 24/7 security team along with a modern camera surveillance system. At the same time, technical staff are always on duty to be ready to fix any technical problems of the factories operating in the Industrial Park.

Current status of land use planning of VSIP Nghe An Industrial Park

Updating

Priority areas for investment attraction

  • Textile Industry,
  • F&B Industry,
  • Sugar Production,
  • Industries using natural resources.

Investment incentives policy

Corporate Income Tax: Enterprises investing in VSIP Nghe An Industrial Park enjoy large corporate income tax incentives, as this is an Industrial Park in the Southeast Economic Zone. Specifically:

  • Preferential tax rate of 10% within 15 years,
  • Tax exemption for 4 years.
  • Tax reduction for the next 9 years.

Import tax: Enterprises enjoy import tax exemption for the first 5 years.

Project planning map

Updating

VSIP Nghe An Industrial Park Project Evaluation

The project is located in a prime, central location, conveniently connected to important maritime and air routes, and conveniently moving to major economic and political centers of the North Central region.

The complete infrastructure system of the industrial park along with the management and operation services from a reputable investor help ensure the business and production activities of investors are always guaranteed.

Contact information


VSIP 义安工业园区项目概况

VSIP 义安工业园区是义安省一个新兴的、领先的现代化工业园区,旨在吸引投资者前往义安省乃至整个中北省。
该项目根据义安省人民委员会2017年11月9日第5441/QD-UBND号决定进行规划。VSIP 义安工业园区位于义安省兴原县,规划面积750公顷,其中一期工程占地226公顷(其中83公顷为商业及服务用地)。

项目名称:VSIP 义安工业园区

地点:义安省兴原县

投资方:VSIP 义安有限公司

规模:750公顷

开工日期:2017年

项目运营期:至2067年

Phối cảnh dự án Khu công nghiệp VSIP Nghệ An

VSIP Nghe An 项目视角

位置 VSIP 义安工业园区

义安VSIP工业区位于雄原县雄西乡、雄道乡、雄原镇和荣市雄政乡之间。

工业园区地理位置优越,连接1A国道、46A国道、46B国道以及荣市-库阿洛大道等多条主要交通干线。工业园区交通便利,海路、公路、铁路、航空等交通方式便捷通达……

  • 距离荣市3公里;
  • 距离河内市270公里;
  • 距离与老挝接壤的清水口岸80公里;
  • 距离库阿洛港15公里;
  • 距离维赛港4公里;
  • 距离荣市火车站6公里;
  • 距离荣市国际机场4公里。

Vị trí Khu công nghiệp VSIP Nghệ An

VSIP 义安地区

项目在谷歌地图上的位置: Link

VSIP 义安工业园区基础设施

交通系统:交通宽敞、现代化,主干道、支路齐全,路面设计宽度分别为27.31米和38米,确保集装箱卡车能够通达园区内各个地块,方便货物进出园区。

Hạ tâng giao thông Khu công nghiệp VSIP Nghệ An

VSIP 义安省交通基础设施

电力系统:工业园区电力由越南电力集团提供,2x63MVA-110/35/22kV发电站和从Hung Dong站接入的110kV线路。

Trạm biến áp KCN VSIP Nghệ An

VSIP义安工业园区变电站

水源:工业园区自产水源由园区内部净水处理及供水厂保障。

污水处理系统:污水处理厂容量为6000立方米。预计建成后,污水处理厂日处理能力将达到28000立方米/日夜,满足整个项目750公顷土地的污水处理需求。

Nhà máy xử lý nước thải VSIP Nghệ An

VSIP 义安污水处理厂

电信/互联网服务:总机共有8000个号码,3000条线路,确保工业园区内每个地块的电信和互联网服务连接。

消防站:消防系统符合国家标准,消防栓沿工业园区道路轴线布置(每个消防栓间距约100-120米),确保发生火灾时能够有效预防和扑灭火灾。

Trạm phòng cháy chữa cháy VSIP Nghệ An

VSIP 义安消防站

安保系统和技术人员:海阳VSIP工业园区配备24/7全天候安保团队,并配备现代化的摄像监控系统。同时,技术人员随时待命,随时准备解决工业园区内工厂的任何技术问题。

VSIP 义安工业园区土地利用规划现状

更新

招商引资重点领域

  • 纺织业、
  • 食品饮料业、
  • 制糖业、
  • 利用自然资源的行业。

投资激励政策

企业所得税:作为东南经济区内的工业园区,在越南义安工业园区 (VSIP) 投资的企业可享受多项企业所得税优惠政策。具体如下:

  • 15 年内享受 10% 的优惠税率;
  • 4 年免税;
  • 之后 9 年减税。

进口税:企业可享受前 5 年进口税豁免。

项目规划图

更新

VSIP义安工业园区项目评估

该项目地处黄金地段,交通便利,毗邻重要的海上和空中航线,可便捷前往中北部地区的主要经济和政治中心。

工业园区完善的基础设施体系,加上信誉良好的投资者提供的管理和运营服务,确保投资者的经营和生产活动始终得到保障。

联系信息

Helen
Property Investment & Advisory Manager 15 years experience
Kater
Industrial Property
Consultant
5 years experience