[Dong Nai] Sonadezi Long Thanh Industrial Park

May 22, 2025

Overview of Sonadezi Long Thanh Industrial Park project

Sonadezi Long Thanh Industrial Park, Dong Nai Province was invested and built in 2003. After 16 years of development (until 2019), Long Thanh Industrial Park has become one of the most effective industrial parks in attracting investment in Dong Nai when the land for lease has been filled to 100%.

Project name: Sonadezi Long Thanh Industrial Park

Location: Tam An and An Phuoc communes, Long Thanh district, Dong Nai province.

Investor: Sonadezi Long Thanh Joint Stock Company

Scale: 488 ha

Construction start date: 2003

Project operation period: Until 2053

Cổng vào Khu công nghiệp Sonadezi Long Thành

Entrance gate to Sonadezi Long Thanh Industrial Park

Location of Sonadezi Long Thanh Industrial Park

Sonadezi Long Thanh Industrial Park, Dong Nai Province is located on Highway 51 connecting Bien Hoa City with Vung Tau City, in Tam An and An Phuoc communes, Long Thanh District, Dong Nai Province.

Geographical distance from the Industrial Park to

City

Ho Chi Minh City: 25 km
Bien Hoa City: 15 km
Vung Tau City: 50 km

Expressway

Next to Highway 51
3 km from Ho Chi Minh City-Long Thanh-Dau Giay Expressway

Port

Phu My deep-water port: 35 km
Vung Tau seaport: 75 km
Cai Mep and Thi Vai ports: 45 km
Tan Cang Saigon, Cat Lai ports: 25 km

Railway

Bien Hoa Station: 15 km
Song Than Station: 30 km

Airport

Tan Son Nhat Airport: 50 km
Long Thanh International Airport: 11 km

Vị trí Khu công nghiệp Sonadezi Long Thành

Location of Sonadezi Long Thanh Industrial Park

Infrastructure of Sonadezi Long Thanh Industrial Park

Internal road system:

  • Classification: Main road with road width from 20m to 30m including 4 lanes and secondary road with road width under 20m including 2 lanes.
  • Road length: Internal road is built with a length of over 5000m connecting Long Thanh Industrial Park gate with national highways leading to the airport, port, …
  • Technical standards: Internal road is paved with concrete with sidewalks and signs for specialized vehicles to transport goods.

Power supply system

Including 02 63MVA power stations with 22KV power grid of the Industrial Park, connected to the National power grid, and connected to low-voltage transformer stations at the factories of factories in the industrial park.

Water supply system

A clean water supply plant with a capacity of 20,000 m3/day and night has been built and put into operation to ensure adequate water supply for production and daily life in the industrial park. Pressure pumping station: in operation

Wastewater treatment system

  • Long Thanh Dong Nai Industrial Park has built a wastewater treatment plant with a capacity of 15,000 m3/day and night, with water treatment quality meeting column A standards of the Ministry of Natural Resources and Environment.
  • The volume of wastewater charged is 80% of the volume of water supplied to factories using land and workshops in the industrial park

Communication system

IDD 3750 telephone switchboard and ADSL 8Mbps broadband internet master station, fiber optic cable

Fire prevention and fighting system

  • Fire alarm: Installed in all factory areas to alert in case of fire.
  • Fire trucks: The entire industrial park is equipped with specialized fire trucks for immediate use when needed.
  • Fire hydrants: Along the roads inside Long Thanh Export Processing Zone, fire hydrants are installed according to standard 6379:1988.
    Security system
  • Surveillance cameras: The entire industrial park has a camera system installed at control posts and production areas.
  • Guard posts: At the gate of Long Thanh Industrial Park and many important locations inside, there are guard posts operating 24/7. The security team regularly patrols and monitors in shifts to ensure high safety for people, vehicles and goods.

Current status of land use planning of Sonadezi Long Thanh Industrial Park

  • Total area of ​​the whole area: 488 ha
  • Industrial land area: 309.13 ha
  • Service land area: 24.68 ha
  • Green trees & public works: 154.19 ha

Priority areas for investment attraction

  • Electroplating industry;
  • Seafood processing;
  • Production of plant protection chemicals;
  • Fertilizer production;
  • Pulp production.
  • Electricity – Electronics and other household electrical equipment.
  • Production of fibers, textiles.
  • Production of plant protection chemicals.
  • Production of fashion goods and fashion accessories.
  • Processing and production of leather goods

Investment incentives policy

Corporate income tax exemption: Applicable for the first 2 years.

  • 50% corporate income tax exemption: Applicable for the next 4 years.
  • 100% free support: Procedures for applying for investment licenses, business investment certificates or business licenses, etc.

Project planning map

Download high quality project planning diagram file: Link

Sonadezi Long Thanh Industrial Park Project Evaluation

Solid ground reduces construction costs: According to the Department of Land Administration of Long Thanh district, the land for construction in the industrial park has a high compression level with a load capacity of up to 25 tons/m2. Therefore, businesses will minimize costs for building factories and many other items.

Investment incentives to reduce capital and increase profits: The owner of Long Thanh Industrial Park is applying many investment incentives.

Long Thanh Industrial Park has been providing businesses with two most important factors for business development: a large developing market and abundant labor resources. The project helps production facilities quickly reach potential customers, bring products closer to users and receive a large number of orders that increase over time.

Diverse rental products: Long Thanh Industrial Park provides industrial land for rent and over 5 types of factories for production. Businesses can easily find products suitable for their business lines and production lines.

Synchronous infrastructure provides great amenities: All rental products are fully equipped with electricity, water, wastewater treatment and communication systems. Along with that is a spacious internal road system supporting convenient transportation.

Services of Vietnam Property Hub

With a team of staff with many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub provides the following services:
  • Investment promotion (land, factories) in industrial parks, industrial clusters and commercial service land, …
  • Legal support & Investment consulting in areas related to industrial real estate.
  • Connecting and cooperating in industrial real estate investment.

Contact consultant

 


Sonadezi Long Thanh工业园区项目概况

同奈省Sonadezi隆城工业园区于2003年投资兴建。经过16年的发展(截至2019年),隆城工业园区已成为同奈省最有效的招商引资工业园区之一,土地租赁率已达100%。

项目名称:Sonadezi隆城工业园区

地点:同奈省隆城县三安乡和安福乡。

投资方:Sonadezi隆城股份公司

规模:488公顷

开工日期:2003年

项目运营期限:至2053年

Cổng vào Khu công nghiệp Sonadezi Long Thành

Sonadezi Long Thanh 工业园区入口大门

Sonadezi Long Thanh 工业园区位置

同奈省隆城工业园区 Sonadezi 位于连接边和市和头顿市的 51 号公路沿线,隶属于同奈省隆城县三安乡和安福乡。

工业园区与以下城市的地理距离:

胡志明市:25 公里
边和市:15 公里
头顿市:50 公里

高速公路

毗邻 51 号高速公路
距离胡志明市-隆城-Dau Giay 高速公路 3 公里

港口

Phu My深水港:35公里
头顿海港:75 公里
Cai Mep 和 Thi Vai 港口:45 公里
Tan Cang 西贡、Cat Lai 港口:25 公里

铁路

边和站:15公里
Song Than车站:30公里

飞机场

新山一机场:50 公里
龙城国际机场:11公里

Vị trí Khu công nghiệp Sonadezi Long Thành

Sonadezi Long Thanh 工业园区位置

Sonadezi Long Thanh 工业园区基础设施

内部道路系统:

等级:主干道,路宽20米至30米,共4车道;次干道,路宽20米以下,共2车道。
道路长度:内部道路长度超过5000米,连接隆城工业园区大门和通往机场、港口等地的国家公路。
技术标准:内部道路为混凝土路面,设有人行道和专用车辆标志,方便货物运输。

供电系统

包括两座63兆伏安的发电站,与工业园区22千伏电网相连,并接入国家电网,并与工业园区内各工厂的低压变电站连接。

供水系统

已建成并投入运营一座日供水能力为2万立方米/夜的清水厂,确保工业园区生产生活用水充足。加压泵站:已投入运营。

污水处理系统

隆城同奈工业园区已建成一座污水处理厂,日处理能力达15,000立方米/天,水质达到自然资源与环境部A级标准。
污水处理量为工业园区内土地及厂房供水量的80%。

通讯系统

IDD 3750电话交换机、ADSL 8Mbps宽带互联网主机、光纤电缆

防火灭火系统

  • 火灾报警系统:所有厂区均安装火灾警报系统,以便在发生火灾时发出警报。
  • 消防车:整个工业园区配备专用消防车,以便在需要时立即投入使用。
  • 消防栓:隆城出口加工区内道路沿线均按照6379:1988标准安装消防栓。

安保系统

  • 监控摄像头:整个工业园区的控制点和生产区域均安装了监控系统。
  • 岗哨:隆城工业园区门口及园区内许多重要地点均设有岗哨,全天候24小时值守。安保团队定期轮班巡逻和监控,确保人员、车辆和货物的安全。

Sonadezi Long Thanh 工业园区土地利用规划现状

  • 总面积:488公顷
  • 工业用地面积:309.13公顷
  • 服务用地面积:24.68公顷
  • 绿化及公共工程用地面积:154.19公顷

招商引资重点领域

  • 电镀行业;
  • 海产品加工;
  • 植物保护化学品生产;
  • 肥料生产;
  • 纸浆生产。
  • 电力 – 电子及其他家用电器。
  • 纤维、纺织品生产。
  • 植物保护化学品生产。
  • 时尚商品及时尚配饰生产。
  • 皮革制品加工及生产

投资激励政策

企业所得税豁免:前两年适用。

  • 企业所得税减免50%:后四年适用。
  • 100%免费支持:投资许可证、商业投资证书或营业执照等申请手续。

项目规划图

Download high quality project planning diagram file: Link

Sonadezi隆城工业园区项目评估

坚实的地基降低了建设成本:据隆城县土地管理局介绍,工业园区的建设用地抗压强度高,承重能力高达每平方米25吨。因此,企业可以最大限度地降低建造厂房及其他诸多项目的成本。

投资激励措施,降低资本投入,提高利润:隆城工业园区的业主正在实施多项投资激励措施。

隆城工业园区为企业发展提供了两大关键要素:巨大的发展中市场和丰富的劳动力资源。该项目有助于生产设施快速触达潜在客户,拉近产品与用户的距离,并带来持续增长的订单。

多样化的租赁产品:隆城工业园区提供工业用地租赁和五种以上类型的生产厂房。企业可以轻松找到适合其业务和生产线的产品。

同步的基础设施提供一流的便利:所有租赁产品均配备齐全的电力、供水、污水处理和通讯系统。此外,园区还拥有宽敞的内部道路系统,交通便利。

越南房地产中心的服务

越南房地产中心拥有一支在项目投资实施领域拥有多年经验的员工队伍,与工业园区管理委员会、项目投资者合作,为众多国内外投资者提供服务,提供以下服务:
  • 工业园区、产业集群和商业服务用地的招商引资(土地、工厂)……
  • 工业地产相关领域的法律支持和投资咨询。
  • 工业地产投资对接与合作。

联系顾问

Helen
Property Investment & Advisory Manager 15 years experience
Kater
Industrial Property
Consultant
5 years experience