Ho Nai Industrial Park is the largest industrial park project in Dong Nai province, located in the East of Bien Hoa city. Belonging to two administrative units: Bien Hoa city and Trang Bom province.
Project name: Ho Nai Industrial Park
Location: Bien Hoa city and Trang Bom district, Dong Nai province
Investor: Ho Nai Industrial Park Joint Stock Company (HONIZ)
Scale: 496.65 ha
Phase 1: 225.71 ha
Phase 2: 270.94 ha
Construction start date: 2001
Project operation period:
Phase 1: Until 2048
Phase 2: Until June 1, 2065.
After the above deadline, enterprises with requests can be extended the land lease period according to the law.
Investor of Ho Nai Industrial Park
Ho Nai Industrial Park is located in the East of Bien Hoa City, in the area of two administrative units of Dong Nai Province, Bien Hoa City and Trang Bom District.
Adjacent to Ho Nai Industrial Park includes:
The West borders the National Defense land.
Ho Nai Industrial Park location with perfect regional connectivity
Road
Waterway
Traffic System
The main road system has a road width of 40m to 45m with 02 lanes, the road surface is 12m to 15m wide, connecting the industrial park with National Highway 1A and the bypass of Bien Hoa City; the road surface structure is hot asphalt concrete and cement concrete. The internal traffic system has a road width of 24m to 28m with two lanes, the road surface is 8m to 12m wide; the road surface structure is hot asphalt concrete and cement concrete.
Power supply system
Using national power source through 220/22KV station with a capacity of 40MVA invested by Dong Nai Electricity Company Limited and in the future will be upgraded to 80MVA.
Water supply system
Using water source from Long Binh water plant (Bien Hoa city) of Dong Nai Water Supply Construction Company Limited with current capacity of 200,000m3/day and night.
Wastewater treatment
Perspective of Ho Nai Industrial Park wastewater treatment plant
Waste treatment
The company contracts with a unit with the function of collecting and treating waste
Fire fighting system
Fire hydrants are installed according to regulations on approved fire prevention routes in Ho Nai Industrial Park.
Drainage system
The rainwater drainage system is collected through pipes along the roads and flows into natural streams in the Industrial Park (with the ability to drain very quickly).
Telecommunication
The system is connected to the telecommunications network of Dong Nai Provincial Post Office through Ho Nai Industrial Park Post Office. The switchboard capacity of Ho Nai Industrial Park is 3,600 numbers, building and installing a 1.5 km underground cable line with a total capacity of 3,600 pairs from Ho Nai Industrial Park Post Office.
Total project planning is 496.65 ha
Phase 1: Area scale 225.71 ha – currently 120 ha has been leased, reaching 80% of the leased land area.
Phase 2: Area scale 270.94ha – currently in the compensation and site clearance stage, but has an investor leasing for 30 hours:
Updating
Download high quality project planning diagram file: Link
Updating
胡奈工业园区是同奈省最大的工业园区项目,位于边和市东部。隶属于边和市和长命府两个行政区。
项目名称:胡奈工业园区
地点:同奈省边和市及长命府县
投资方:胡奈工业园区股份公司(HONIZ)
规模:496.65公顷
一期:225.71公顷
二期:270.94公顷
开工日期:2001年
项目运营期限:
一期:至2048年
二期:至2065年6月1日。
在上述期限之后,有需求的企业可依法延长土地租赁期限。
河奈工业园区投资者
胡奈工业园区位于边和市东部,横跨同奈省的两个行政区:边和市和庄奔县。
胡奈工业园区周边区域包括:
北部紧邻现有的南北铁路线,远期规划为庄奔(同奈)至和兴(西贡)高速铁路线,以及一条长约1公里的沥青路,连接1A国道通往边和市或通往中部和北部省份。
南部紧邻居民区(现状),距离1A国道(边和市绕城段)约1.5公里。
东部紧邻现有居民区,沥青路连接1A国道(边和市绕城段),并延伸至51国道,后者计划未来成为边和市的绕城公路。
西部紧邻国防用地。
河奈工业园区地理位置优越,区域连通性极佳
公路
水路
交通系统
主干道系统道路宽度为40米至45米,设有双车道,路面宽度为12米至15米,连接工业园区与1A国道及边和市绕城公路;路面结构为热沥青混凝土和水泥混凝土。内部交通系统道路宽度为24米至28米,设有双车道,路面宽度为8米至12米;路面结构为热沥青混凝土和水泥混凝土。
供电系统
该电站采用国家电源,由同奈电力有限公司投资建设,容量为40兆伏安(MVA),未来将升级至80兆伏安。
供水系统
水源来自同奈供水建设有限公司旗下的龙平水厂(位于边和市),目前供水能力为20万立方米/日/夜。
废水处理
河奈工业园区污水处理厂透视图
废物处理
公司与一家专门负责废物收集和处理的单位签订了合同。
消防系统
根据规定,在河奈工业园区已批准的消防路线上安装了消防栓。
排水系统
雨水排放系统通过沿路管道收集,并流入工业园区的自然溪流(排水速度极快)。
电信
该系统通过河奈工业园区邮局连接到同奈省邮局的电信网络。河奈工业园区的交换机容量为3600个号码,正在建设和安装一条1.5公里长的地下电缆线路,总容量为3600对。
项目规划总面积496.65公顷
一期:占地面积225.71公顷,目前已租赁120公顷,已达到租赁面积的80%。
第二阶段:面积270.94公顷——目前处于补偿和场地清理阶段,但已有投资者租赁30小时:
Updating
Download high quality project planning diagram file: Link
Updating