Dong Xoai 3 IP The detailed planning project was approved by the People’s Committee of Binh Phuoc province in Decision No. 82/QD-UBND on the planning of Dong Xoai III industrial park on January 14, 2009. The project is invested by Binh Phuoc Housing Investment and Trading Joint Stock Company and has been granted an investment certificate and a construction permit.
Project name: Dong Xoai 3 IP
Location: Tien Hung Commune, Dong Xoai City, Binh Phuoc Province.
Investor: Binh Phuoc Housing Investment and Trading Joint Stock Company
Scale: 120.33 ha
Starting time: 2016
Project operation time: until 2066
Entrance gate to Dong Xoai 3 Industrial Park project
about location of, Dong Xoai 3 industrial park Located in Tien Hung commune, Dong Xoai city, Binh Phuoc province. The boundaries are as follows:
Location of Dong Xoai 3 Industrial Park
Dong Xoai 3 industrial park Located 4 km south of Dong Xoai city center, very convenient for transportation to Ho Chi Minh City and neighboring provinces:
Traffic system
External traffic:
Provincial Road 741 is about 500m east of the industrial park.
Ho Chi Minh Road (the section bypassing Dong Xoai town) is about 400m north of the northern boundary of the industrial park.
The road leading to the industrial park from the East-West direction from Provincial Road 741, next to the southern boundary of the industrial park, has a road width of 36m.
Main roads of the industrial park:
Road No. 3A: is the main road along the North-South axis, perpendicular to the road leading to the industrial park and is also the landscape axis of the industrial park. Road width of 35m.
Road No. 3B: continues at the intersection of Road No. 3A and Road No. 8, continues to the North, connecting with Ho Chi Minh Road (section bypassing Dong Xoai town). Road width of 31m.
Road No. 1A: parallel to Road No. 3 to the East, from the road leading to the industrial park to Road No. 8. Road width 28m.
Internal roads:
Including roads No. 1B; No. 4; No. 5A; No. 6 and No. 8: Road width 24m.
Including roads No. 2, No. 5B and No. 7: Road width 18.5m.
In the industrial park, there is a parking lot: serving and repairing vehicles, with an area of 1.76ha.
Power supply system
The power supply for the Industrial Park is the national grid via the 110KV high voltage line and the 110/22kV transformer station. Connected on the 110KV Tri An – Dong Xoai line to supply Dong Xoai 3.
Electricity price: paid directly to Binh Phuoc Electricity Company according to the state price at the time of use.
Water supply and drainage system
The water supply for the Industrial Park is taken from the common water supply system of Dong Xoai town with the water supply pipeline on Provincial Road 741.
Clean water price: paid directly to Binh Phuoc Water Supply Company according to the state price at the time of use.
Wastewater treatment system
Construct an underground sewer system with a diameter of F300mm – F800mm through factories to collect wastewater and bring it to a treatment plant with a capacity of Q=4,000m3/day located at a low-lying location (North) of the industrial park.
Wastewater after the treatment plant meets standard type A (QCVN 40:2011/BTNMT) and is discharged into the B2000 canal and led to Suoi Da, the starting point of Cai Be stream, and led to Song Be.
Wastewater treatment price: will be announced after the wastewater treatment plant is put into operation.
Telecommunication system
The communication system for Dong Xoai III Industrial Park – Dong Xoai town provides full services for agencies and factories in the Industrial Park.
Subscription price: paid directly to the telecommunications service provider.
Total planning area: 121ha
Cleared area: 120.3ha
Industrial land area: 77ha
Planning map of Dong Xoai 3 Industrial Park
It is a comprehensive, multi-industry industrial park with many different types of industries, the main industries are as follows:
According to Resolution No. 31/2017/NQ-HDND dated July 19, 2017 of the People’s Council of Binh Phuoc Province promulgating regulations on investment incentives and incentives in Binh Phuoc Province.
Depending on the industry of the Investor, the incentives on corporate income tax will be at different levels, but usually the incentives on corporate income tax will be as follows:
Tax exemption for 2 years and 50% reduction of payable tax in the next 4 years. Tax exemption and reduction period: Calculated continuously from the first year of taxable income from the new investment project enjoying tax incentives.
Tax rate of 17% for 15 years of application. Time of application of preferential tax rate: Calculated continuously from the first year the enterprise has revenue from the new investment project…
Download high quality file of industrial park planning map: Link
Binh Phuoc is considered a province in the Southern key economic region, with strengths in construction, industrial development, and a high urbanization rate. In particular, Dong Xoai III Industrial Park is included in the strategy for developing industrial parks and in the overall planning orientation of industrial parks in Binh Phuoc province, thereby attracting investment capital for production and business to the province. In addition, Dong Xoai III Industrial Park has a strategic location connecting with the main route DT 741. This is considered an inter-provincial route connecting traffic between Binh Duong, Binh Phuoc, and the Central Highlands provinces. On both sides of DT741 are satellite industrial parks, high-tech industrial parks such as: Dai Dang Industrial Park, Dong An Industrial Park, Taiwan Industrial Park, Vsip 2 Industrial Park, Vsip 2 Industrial Park expansion… This solves the problem of trade between Binh Phuoc province and the region.
Dong Xoai 3 IP 该详细规划项目已于2009年1月14日获得平福省人民委员会关于同泽第三工业区规划的第82/QD-UBND号决议批准。该项目由平福住房投资贸易股份公司投资,并已获得投资许可证和建筑许可证。
项目名称: Dong Xoai 3 IP
地点:平福省同泽市先兴乡
投资者:平福住房投资贸易股份公司
规模:120.33公顷
开工时间:2016年
项目运营期限:至2066年
同泽3工业园区项目入口大门
同泽3工业园区位于平福省同泽市前雄乡。园区边界如下:
同泽3工业园区位置
同泽3号工业园区位于同泽市中心以南4公里处,交通便利,可轻松前往胡志明市及周边省份:
交通系统
外部交通:
741省道位于工业园区东侧约500米处。
胡志明路(绕过同泽镇路段)位于工业园区北边界以北约400米处。
从741省道东西向通往工业园区的道路紧邻工业园区南边界,道路宽36米。
工业园区主要道路:
3A路:沿南北轴线的主干道,与通往工业园区的道路垂直,也是工业园区的景观轴线。道路宽35米。
3B路:从3A路与8号路交叉口继续向北延伸,与胡志明路(绕过同泽镇路段)相连。道路宽31米。
1A路:与3号路向东平行,从通往工业园区的道路延伸至8号路。道路宽度28米。
园区内道路:
包含1B路、4号路、5A路、6号路和8号路:道路宽度24米。
包含2号路、5B路和7号路:道路宽度18.5米。
工业园区内设有停车场,用于车辆维修保养,面积1.76公顷。
供电系统
工业园区的电力由国家电网通过110千伏高压线路和110/22千伏变电站供电。接入110千伏治安-同泽线路,为同泽3号供电。
电价:根据使用时的国家电价,直接支付给平福电力公司。
供排水系统
工业园区供水采用同泽镇公共供水系统,供水管道位于741省道。
净水价格:使用时按照国家价格直接支付给平福供水公司。
污水处理系统
建设一条直径为F300毫米至F800毫米的地下污水管道系统,穿过工厂,收集污水并将其输送至位于工业园区北部低洼地带、处理能力为Q=4,000立方米/天的污水处理厂。
污水经处理厂处理后,达到A类标准(QCVN 40:2011/BTNMT)后排入B2000运河,并汇入蔡贝河的源头索伊达,最终汇入松贝河。
污水处理价格:待污水处理厂投入运营后另行公布。
电信系统
同泽三工业区(同泽镇)的电信系统为工业区内的机构和工厂提供全方位服务。
订购费用:直接支付给电信服务提供商。
总规划面积:121公顷
已清理面积:120.3公顷
工业用地面积:77公顷
同泽3工业园区规划图
它是一个综合性、多产业园区,涵盖多种产业类型,主要产业包括:
轻工业;
食品饮料业;
化妆品、调味品和制药业;
机械制造业;
高端建筑材料及室内外装饰业。
根据平福省人民议会2017年7月19日第31/2017/NQ-HDND号决议,颁布了关于平福省投资激励和优惠政策的规定。
根据投资者所处的行业,企业所得税优惠政策将有所不同,但通常的企业所得税优惠政策如下:
2年免税,之后4年应纳税额减半。免税、减税期限:自享受税收优惠的新投资项目获得第一年应纳税所得额起连续计算。
适用17%的税率,适用期限为15年。优惠税率适用时间:自企业获得新投资项目收入的第一年起连续计算……
下载工业园区规划图高清文件: Link
平福省是南部重点经济区省份,在建筑业、工业发展和高城市化率方面具有优势。特别是同泽第三工业园区被纳入平福省工业园区发展战略和工业园区总体规划方向,从而吸引投资资金来该省投资生产经营。此外,同泽第三工业园区地理位置优越,与主干道DT 741相连。DT 741是连接平阳、平福和西原三省的省际交通干线。DT 741两侧分布着卫星工业园区和高科技工业园区,例如:大当工业园区、同安工业园区、台湾工业园区、Vsip 2工业园区、Vsip 2工业园区扩建项目……这解决了平福省与该地区之间的贸易问题。