Xuan Loc Industrial Park Construction began in 2005 in Xuan Loc District, Dong Nai Province. Xuan Loc Industrial Park has a great advantage in transporting goods with its location next to National Highway 1, the main North-South traffic axis of Vietnam and a relatively close distance from Xuan Loc Industrial Park to locations such as Gia Ray railway station, Ho Chi Minh City – Dau Giay – Long Thanh highway and Phu My port.
Project name: Xuan Loc Industrial Park
Location: Xuan Tam Commune, Xuan Hiep Commune, Xuan Loc District, Dong Nai
Investor: Sonadezi Long Binh Joint Stock Company
Scale: 108.8 (ha)
Start date: 2005
Project duration: Until 2056
After the above deadline, enterprises with requests can be extended the land lease period according to the law.
Overview of Xuan Loc Industrial Park project
Xuan Loc Industrial Park Located right next to National Highway 1, the main North-South traffic axis, in Xuan Tam – Xuan Hiep commune, Xuan Loc district, Dong Nai province.
Location Xuan Loc Industrial Park
Road:
Located right next to National Highway 1, the main North-South traffic axis
Distance to Long Khanh town: 20 km
Distance to Ho Chi Minh – Long Thanh – Dau Giay expressway: 35 km
Distance to Bien Hoa city: 90 km
Distance to Ho Chi Minh city: 110 km
Waterway:
Distance to Phu My port: 70 km
Distance to Go Dau port: 73 km
Distance to Cai Mep port: 98 km
Distance to Cat Lai port: 108 km
Airway:
Distance to Tan Son Nhat airport: 114 km
Distance to Long Thanh airport: 77 km
Perfect regional connectivity from Xuan Loc Industrial Park project
Water supply system:
Supply from Dong Nai Water Supply Company, capacity 25,000 m3/day.
Current water price: details at www.dowaco.vn.
Power supply system:
Supply from the national grid.
Current electricity price: details according to Decision No. 4495/QD-BCT dated November 30, 2017 regulating electricity prices of the Ministry of Industry and Trade.
Telecommunication system:
Complete technical corridor system for telecommunication services ADSL, FAX …
Wastewater treatment system:
Total capacity: 1,000 m3/day, combined biological and physical-chemical treatment technology.
Wastewater after treatment according to standard QCVN 40:2011/BTNMT, column A. Wastewater treatment fee (excluding VAT): VND 7,282/m3 (» USD 0.32/m3).
Rainwater drainage system:
Designed and built separately from the wastewater collection system. Drainage lines are arranged along the roads, discharging directly into rivers and streams according to the natural terrain. The general rainwater collection system of the Industrial Park includes reinforced concrete round sewers with a diameter of D≥1,000mm and box culverts with a load capacity of D>1,000mm.
Wastewater collection system:
Using reinforced concrete sewers with a load capacity of H10 to collect all wastewater from enterprises in Xuan Loc Industrial Park and connecting
to the centralized wastewater treatment plant of the Industrial Park.
Project planning diagram of Xuan Loc Industrial Park
Corporate income tax
100% tax exemption for the first 2 years and 50% reduction for the next 4 years. Applicable to enterprises implementing new investment projects in industrial parks.
100% tax exemption for the first 4 years and 50% reduction for the next 9 years. Applicable to newly established enterprises from investment projects in the following fields: Software product manufacturing; High technology according to the provisions of law; Scientific research and technology development; Manufacturing of priority supporting industrial products.
Download high quality project planning diagram file:Link
updating
——-
Xuan Loc Industrial Park Construction began in 2005 in Xuan Loc District, Dong Nai Province. Xuan Loc Industrial Park has a great advantage in transporting goods with its location next to National Highway 1, the main North-South traffic axis of Vietnam and a relatively close distance from Xuan Loc Industrial Park to locations such as Gia Ray railway station, Ho Chi Minh City – Dau Giay – Long Thanh highway and Phu My port.
Project name: Xuan Loc Industrial Park
Location: Xuan Tam Commune, Xuan Hiep Commune, Xuan Loc District, Dong Nai
Investor: Sonadezi Long Binh Joint Stock Company
Scale: 108.8 (ha)
Start date: 2005
Project duration: Until 2056
After the above deadline, enterprises with requests can be extended the land lease period according to the law.
Overview of Xuan Loc Industrial Park project
Xuan Loc Industrial Park Located right next to National Highway 1, the main North-South traffic axis, in Xuan Tam – Xuan Hiep commune, Xuan Loc district, Dong Nai province.
Location Xuan Loc Industrial Park
Road:
Located right next to National Highway 1, the main North-South traffic axis
Distance to Long Khanh town: 20 km
Distance to Ho Chi Minh – Long Thanh – Dau Giay expressway: 35 km
Distance to Bien Hoa city: 90 km
Distance to Ho Chi Minh city: 110 km
Waterway:
Distance to Phu My port: 70 km
Distance to Go Dau port: 73 km
Distance to Cai Mep port: 98 km
Distance to Cat Lai port: 108 km
Airway:
Distance to Tan Son Nhat airport: 114 km
Distance to Long Thanh airport: 77 km
Perfect regional connectivity from Xuan Loc Industrial Park project
Water supply system:
Supply from Dong Nai Water Supply Company, capacity 25,000 m3/day.
Current water price: details at www.dowaco.vn.
Power supply system:
Supply from the national grid.
Current electricity price: details according to Decision No. 4495/QD-BCT dated November 30, 2017 regulating electricity prices of the Ministry of Industry and Trade.
Telecommunication system:
Complete technical corridor system for telecommunication services ADSL, FAX …
Wastewater treatment system:
Total capacity: 1,000 m3/day, combined biological and physical-chemical treatment technology.
Wastewater after treatment according to standard QCVN 40:2011/BTNMT, column A. Wastewater treatment fee (excluding VAT): VND 7,282/m3 (» USD 0.32/m3).
Rainwater drainage system:
Designed and built separately from the wastewater collection system. Drainage lines are arranged along the roads, discharging directly into rivers and streams according to the natural terrain. The general rainwater collection system of the Industrial Park includes reinforced concrete round sewers with a diameter of D≥1,000mm and box culverts with a load capacity of D>1,000mm.
Wastewater collection system:
Using reinforced concrete sewers with a load capacity of H10 to collect all wastewater from enterprises in Xuan Loc Industrial Park and connecting
to the centralized wastewater treatment plant of the Industrial Park.
Project planning diagram of Xuan Loc Industrial Park
Corporate income tax
100% tax exemption for the first 2 years and 50% reduction for the next 4 years. Applicable to enterprises implementing new investment projects in industrial parks.
100% tax exemption for the first 4 years and 50% reduction for the next 9 years. Applicable to newly established enterprises from investment projects in the following fields: Software product manufacturing; High technology according to the provisions of law; Scientific research and technology development; Manufacturing of priority supporting industrial products.
Download high quality project planning diagram file:Link
updating
Xuan Loc Industrial Park Construction began in 2005 in Xuan Loc District, Dong Nai Province. Xuan Loc Industrial Park has a great advantage in transporting goods with its location next to National Highway 1, the main North-South traffic axis of Vietnam and a relatively close distance from Xuan Loc Industrial Park to locations such as Gia Ray railway station, Ho Chi Minh City – Dau Giay – Long Thanh highway and Phu My port.
Project name: Xuan Loc Industrial Park
Location: Xuan Tam Commune, Xuan Hiep Commune, Xuan Loc District, Dong Nai
Investor: Sonadezi Long Binh Joint Stock Company
Scale: 108.8 (ha)
Start date: 2005
Project duration: Until 2056
After the above deadline, enterprises with requests can be extended the land lease period according to the law.
Overview of Xuan Loc Industrial Park project
Xuan Loc Industrial Park Located right next to National Highway 1, the main North-South traffic axis, in Xuan Tam – Xuan Hiep commune, Xuan Loc district, Dong Nai province.
Location Xuan Loc Industrial Park
Road:
Located right next to National Highway 1, the main North-South traffic axis
Distance to Long Khanh town: 20 km
Distance to Ho Chi Minh – Long Thanh – Dau Giay expressway: 35 km
Distance to Bien Hoa city: 90 km
Distance to Ho Chi Minh city: 110 km
Waterway:
Distance to Phu My port: 70 km
Distance to Go Dau port: 73 km
Distance to Cai Mep port: 98 km
Distance to Cat Lai port: 108 km
Airway:
Distance to Tan Son Nhat airport: 114 km
Distance to Long Thanh airport: 77 km
Perfect regional connectivity from Xuan Loc Industrial Park project
Water supply system:
Supply from Dong Nai Water Supply Company, capacity 25,000 m3/day.
Current water price: details at www.dowaco.vn.
Power supply system:
Supply from the national grid.
Current electricity price: details according to Decision No. 4495/QD-BCT dated November 30, 2017 regulating electricity prices of the Ministry of Industry and Trade.
Telecommunication system:
Complete technical corridor system for telecommunication services ADSL, FAX …
Wastewater treatment system:
Total capacity: 1,000 m3/day, combined biological and physical-chemical treatment technology.
Wastewater after treatment according to standard QCVN 40:2011/BTNMT, column A. Wastewater treatment fee (excluding VAT): VND 7,282/m3 (» USD 0.32/m3).
Rainwater drainage system:
Designed and built separately from the wastewater collection system. Drainage lines are arranged along the roads, discharging directly into rivers and streams according to the natural terrain. The general rainwater collection system of the Industrial Park includes reinforced concrete round sewers with a diameter of D≥1,000mm and box culverts with a load capacity of D>1,000mm.
Wastewater collection system:
Using reinforced concrete sewers with a load capacity of H10 to collect all wastewater from enterprises in Xuan Loc Industrial Park and connecting
to the centralized wastewater treatment plant of the Industrial Park.
Project planning diagram of Xuan Loc Industrial Park
Corporate income tax
100% tax exemption for the first 2 years and 50% reduction for the next 4 years. Applicable to enterprises implementing new investment projects in industrial parks.
100% tax exemption for the first 4 years and 50% reduction for the next 9 years. Applicable to newly established enterprises from investment projects in the following fields: Software product manufacturing; High technology according to the provisions of law; Scientific research and technology development; Manufacturing of priority supporting industrial products.
Download high quality project planning diagram file:Link
updating
——-
春禄工业园区于2005年在同奈省春禄县开工建设。春禄工业园区毗邻越南南北交通主干道1号国道,交通便利,地理位置优越,交通便利,距离嘉雷火车站、胡志明市-油桥-隆成高速公路以及富美港等地均较近。
项目名称:春禄工业园区
地点:同奈省春禄县春协乡春心乡
投资方:Sonadezi Long Binh股份公司
规模:108.8公顷
开工日期:2005年
项目工期:至2056年
在上述期限后,有需求的企业可依法延长土地租赁期限。
春禄工业园区项目概况
春禄工业园区位于同奈省春禄县春心-春协社,紧邻 1 号国道,是南北交通主轴线。
位置 春禄工业园区
公路:
紧邻1号国道,是南北交通主干道。
距离隆庆镇:20公里
距离胡志明-隆成-油桥高速公路:35公里
距离边和市:90公里
距离胡志明市:110公里
水路:
距离富美港:70公里
距离古斗港:73公里
距离盖梅港:98公里
距离吉莱港:108公里
航空:
距离新山一机场:114公里
距离隆成机场:77公里
春禄工业园区项目带来完美的区域连通性
供水系统:
由同奈省供水公司供水,供水能力为25,000立方米/天。
当前水价:详情请访问www.dowaco.vn。
供电系统:
由国家电网供电。
当前电价:详情根据2017年11月30日工业和贸易部第4495/QD-BCT号决定执行,该决定规范了工业和贸易部的电价。
电信系统:
完整的电信服务技术走廊系统,包括ADSL、传真等
污水处理系统:
总处理能力:1000立方米/天,采用生物和物化联合处理技术。
污水处理后符合QCVN 40:2011/BTNMT标准A栏。污水处理费(不含增值税):7282越南盾/立方米(»0.32美元/立方米)。
雨水排放系统:
雨水排放系统与污水收集系统分开设计和建造。排水管道沿道路布置,根据自然地形直接排入河流。工业园区的常规雨水收集系统包括直径D≥1000毫米的钢筋混凝土圆形排水管和承载能力D>1000毫米的箱涵。
污水收集系统:
采用承载能力为H10的钢筋混凝土污水管道,收集春禄工业园区内所有企业产生的污水,并接入工业园区集中污水处理厂。
春禄工业园区项目规划图
企业所得税
前两年免征100%企业所得税,后四年减半征收。适用于在工业园区实施新投资项目的企业。
前四年免征100%企业所得税,后九年减半征收。适用于以下领域投资项目新设立的企业:软件产品制造;依法规定的高新技术产业;科学研究与技术开发;重点扶持的工业产品生产。
Download high quality project planning diagram file:Link
updating