[Dong Nai] Ong Keo Industrial Park

June 18, 2025

Overview of Ong Keo Industrial Park project

Ong Keo Industrial Park Tinh Nghia Company continues to establish investment projects, after the successes of Nhon Trach 3 Industrial Park, Tam Phuoc Industrial Park, Ong Keo Industrial Park, Tan Phu Industrial Park. The project is located along Ong Keo dike, adjacent to Long Tau River and Dong Tranh River in Phuoc Khanh Commune, Nhon Trach District, Ong Keo Industrial Park is very convenient for the development of heavy industries, with the need to use on-site ports such as shipbuilding, metallurgy, automobile manufacturing, thermal power production, construction materials, etc.

Project name: Ong Keo IP

Location: Phuoc Khanh Commune, Nhon Trach District, Dong Nai Province

Investor: Tin Nghia Corporation

Scale: 855.6 ha

Start date: 2008

Project duration: until 2058

Toàn cảnh dự án Khu công nghiệp Ông Kèo

Overview of Ong Keo Industrial Park project

Location of Ong Keo Industrial Park

Ong Keo IP belongs to the future city of Nhon Trach, located close to Ho Chi Minh City, with favorable traffic conditions, especially waterway traffic. The industrial park is convenient for industries, construction, and services that need to use on-site ports.

Vị trí dự án Khu công nghiệp Ông Kèo

Project location Ong Keo Industrial Park

  • 15 km from Ho Chi Minh City center.
  • 20 km from Tan Son Nhat airport.
  • 55 km from Bien Hoa city center.
  • 55 km from Vung Tau city.
  • 15 km from Long Thanh International Airport (according to Government regulations).
  • 25 km from Go Dau port, Thi Vai – Phuoc An port.
  • 12 km from Cat Lai port.

Ong Keo Industrial Park Infrastructure

Internal traffic system: reasonably designed to ensure smooth traffic throughout the industrial park. The system is designed as follows:

Main roads in the industrial park are 40 m wide – 4 lanes

Branch roads in the industrial park are 22 m wide – 2 lanes

All internal roads are designed and constructed in strict compliance with national regulations, and are finished with Asphalt concrete. Internal roads are also equipped with a complete, aesthetic high-voltage lighting system

Power supply system: Power supply to the industrial park is taken from the 110/35/22KV transformer station. High-voltage power grid is provided along the internal traffic in the industrial park.

Water supply system: Clean water is supplied with a capacity of 30,000 m3 per day from the clean water plant. Water is supplied to the factory fence by an international standard water supply pipe system.

Water and waste treatment system: Wastewater is collected at the industrial park’s wastewater treatment plant to meet water standard A (QCVN 40:2011/BTNMT) before being discharged into the general system of the industrial park. The wastewater plant is built with a treatment capacity of 2,900m3/day – night

Waste is classified, collected and transported out of the industrial park by factories in the industrial park to avoid environmental pollution

Emissions from factories are installed with a filtration system according to national standards before being discharged into the natural environment

Communication system: the industrial park is installed with underground communication cable system and is supplied to the factory fence by international standard cable system

Through the connection system between the industrial park’s communication center through the postal and telecommunications network, all communication needs are guaranteed and are capable of providing all necessary services such as: Private switchboard, international telephone, remote conference, private leased line, high-speed internet, email, etc.

Fire prevention and fighting system: the industrial park is installed with fire warning, prevention and fighting system in strict compliance with national regulations

Fire hydrants are installed at internal traffic hubs, and at every factory to ensure effective protection of the entire area from fire and explosion incidents

Current status of land use planning of Ong Keo Industrial Park

Total planning area: 855.6 ha

  • Industrial park land: 515.24 ha
  • Service center land: 61.31 ha
  • Land for trees and water surface: 162.44 ha
  • Technical infrastructure: 7.55 ha
  • Roads and intermediate ports: 109.06 ha

Sơ đồ quy hoạch dự án Khu công nghiệp Ông Kèo

Project planning diagram of Ong Keo Industrial Park

Priority areas for investment attraction

Mechanical assembly, production of spare parts, electronic components

Consumer production, handicrafts

Textile and footwear industry

Food processing and agricultural products and some other industries

Investment incentives policy

Updating

Ong Keo Industrial Park Project Planning Map

Download high quality file of industrial park planning map: Link

Evaluation of Ong Keo Industrial Park

According to experts, Ong Keo Industrial Park is very convenient for the development of heavy industries that need to use on-site ports such as shipbuilding, metallurgy, automobile manufacturing, thermal power production, construction materials, etc.

From Ong Keo Industrial Park, it is easy to create connections with Nhon Trach Industrial Park and many large industrial parks in Long Thanh such as: Long Thanh Industrial Park, Amata Long Thanh Industrial Park, Phuoc Binh Industrial Park, etc. In particular, thanks to the Dong Nai River and neighboring large ports, the ability to transport goods by waterway is very convenient.

Services of Vietnam Property Hub

With a team of staff with many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub provides the following services:
  • Investment promotion (land, factories) in industrial parks, industrial clusters and commercial service land, …
  • Legal support & Investment consulting in areas related to industrial real estate.
  • Connecting and cooperating in industrial real estate investment.

Contact consultant

 


Ong Keo工业园区项目概况

继仁泽三工业园区、三福工业园区、王胶工业园区和新富工业园区成功开发之后,Tin Nghia公司继续拓展投资项目。该项目位于仁泽县福庆乡王胶堤坝沿岸,毗邻龙头河和同镇河。王胶工业园区地理位置优越,非常适合发展重工业,并利用园区内港口,例如造船、冶金、汽车制造、火电、建筑材料等。

项目名称:王胶工业园区

地点:同奈省仁泽县福庆乡

投资方:Tin Nghia公司

规模:855.6公顷

开工日期:2008年

项目工期:至2058年

Toàn cảnh dự án Khu công nghiệp Ông Kèo

Ong Keo工业园区项目概况

Ong Keo工业园区位置

王桥工业区隶属于仁泽未来城市,毗邻胡志明市,交通便利,尤其是水路交通便利。该工业区为需要使用现场港口的工业、建筑和服务业提供了便利。

Vị trí dự án Khu công nghiệp Ông Kèo

项目地点:Ong Keo工业园区

  • 距胡志明市中心 15 公里。
  • 距新山一机场 20 公里。
  • 距边和市中心 55 公里。
  • 距头顿市 55 公里。
  • 距隆城国际机场 15 公里(根据政府规定)。
  • 距 Go Dau 港口、Thi Vai – Phuoc An 港口 25 公里。
  • 距 Cat Lai 港口 12 公里。

王基奥工业园区基础设施

内部交通系统:合理规划,确保园区交通畅通。系统设计如下:

园区主干道宽40米,共4车道

园区支路宽22米,共2车道

所有园区内部道路均严格按照国家相关规定设计和施工,并采用沥青混凝土路面。园区内部道路还配备了完善美观的高压照明系统。

供电系统:园区供电由110/35/22千伏变电站提供。园区内部交通沿线设有高压电网。

供水系统:园区自来水厂每日供应3万立方米的净水。水源由符合国际标准的供水管道系统输送至厂区围墙。

水和废物处理系统:废水在工业园区的污水处理厂收集,达到水标准A(QCVN 40:2011/BTNMT)后排入工业园区的总体系统。污水处理厂的处理能力为2900立方米/日夜。

工业园区内的工厂对废物进行分类、收集和运输,以避免环境污染。

工厂排放的废水均按照国家标准安装过滤系统,然后排放到自然环境中。

通讯系统:工业园区铺设地下通讯电缆系统,并通过国际标准的电缆系统连接到工厂围栏。

通过工业园区通讯中心与邮电网络的连接系统,所有通讯需求均得到保障,并能够提供所有必要的服务,例如:专用交换机、国际电话、远程会议、专线、高速互联网、电子邮件等。

消防系统:工业园区严格按照国家规定安装消防报警、消防和灭火系统。

内部交通枢纽和每个工厂都安装了消防栓,以确保有效保护整个区域免受火灾和爆炸事故的侵害。

王基工业园区土地利用规划现状

总规划面积:855.6公顷

工业园区用地:515.24公顷
服务中心用地:61.31公顷
林地及水面用地:162.44公顷
技术基础设施用地:7.55公顷
道路及中转港用地:109.06公顷

Sơ đồ quy hoạch dự án Khu công nghiệp Ông Kèo

王基工业园项目规划图

招商引资重点领域

机械装配、零部件生产、电子元件

消费品生产、手工艺品

纺织和制鞋业

食品加工、农产品加工及其他行业

投资激励政策

Updating

王基奥工业园项目规划图

下载工业园区规划图高清文件: Link

王基工业园区评估

据专家介绍,王胶工业园区非常适合发展需要利用本地港口的重工业,例如造船、冶金、汽车制造、火电生产、建筑材料等。

从王胶工业园区出发,可以轻松连接仁泽工业园区以及隆城的多个大型工业园区,例如:隆城工业园区、安美德隆城工业园区、福平工业园区等。尤其得益于同奈河及其周边大型港口,水路运输十分便捷。

越南房地产中心的服务

越南房地产中心拥有一支在项目投资实施领域拥有多年经验的员工队伍,与工业园区管理委员会、项目投资者合作,为众多国内外投资者提供服务,提供以下服务:
  • 工业园区、产业集群和商业服务用地的招商引资(土地、工厂)……
  • 工业地产相关领域的法律支持和投资咨询。
  • 工业地产投资对接与合作。

联系顾问

Helen
Property Investment & Advisory Manager 15 years experience
Kater
Industrial Property
Consultant
5 years experience