Overview of Long Hau High-Tech Auxiliary Factory Project
Long Hau Da Nang High-Tech Auxiliary Factory is an auxiliary factory invested in Da Nang, invested and built by Long Hau Joint Stock Company in Da Nang High-Tech Park with the goal of supporting high-tech industries here.
Total project scale 29.6 ha.
Phase 1: 11.69 ha
Phase 2: 8.36 ha
Phase 3: 9.55 ha
Total investment capital 1,050 billion VND.
Project commencement year 2019.
Factory type: Ready-built factory Factory built on request
Groundbreaking ceremony of Long Hau Da Nang high-tech supporting factory
Location of Long Hau Da Nang high-tech auxiliary factory project
Long Hau Da Nang factory has an extremely strategic location as it is located on the East-West economic corridor and can easily travel through 13 provinces/cities of 3 countries: Laos, Thailand and Myanmar.
Located on the National Highway connecting North and South\
Only 25 km to Tien Sa Port
Only 5 km to Lien Chieu Port
Only 17 km to Da Nang International Airport
Only 15 km to the City Center
Image of Long Hau High-tech Factory location
Long Hau high-tech factory is located in Da Nang high-tech park.
Long Hau high-tech factory planning location
Infrastructure of Long Hau Da Nang High-Tech Auxiliary Factory
Traffic system Traffic routes in KCN include:
The Central Road has a cross-section of Bn = 51m
The subdivision axes have a cross-section of Bn = 22.5m ÷ 33m
The internal roads in each functional area have a cross-section of Bn = 8m ÷ 15m.
Drainage system Drainage in the High-tech Park is designed in a separate drainage direction, specifically as follows:
Wastewater drainage system: dirty water flows into the sewer system and is then cleaned at treatment plants before being discharged into receiving sources (rivers, lakes, etc.).
Rainwater drainage system: there is a separate sewer system and rainwater collection pits, leading directly to receiving sources (rivers, lakes, etc.).
Wastewater drainage system: Build a completely separate drainage system to drain wastewater for Da Nang High-Tech Park. In the high-tech zone, there are 2 key technical infrastructure works and a waste treatment station.
Station 1: mainly focuses on collecting and transferring solid waste, area scale: 0.8 ha. Station 2: invests in a wastewater treatment plant, area scale: 02 ha.
Capacity: 18,000 m3/day.night (04 modules), ensuring thorough treatment of wastewater from the High-Tech Park to meet current environmental technical standards QCVN 40:2011/BTNMT – Column B with coefficients Kq=0.9 and Kf=0.9 before discharging.
Water supply system The water source for the High-Tech Park is expected to be taken from the Hoa Lien Water Plant with a capacity of 240,000 m3/day. Currently, the plant is in the investment preparation stage and will be completed in 2018. In the first phase, when the Hoa Lien Water Plant is not completed, the High-Tech Park will be temporarily supplied with water from the D225 pipeline on the Hai Van Tunnel South bypass. The water source is taken from the DT602 booster pump station; the pump station has a capacity of 120 m3/h, H = 70m. Power supply system The power supply plan for the High-Tech Park is to build the Hoa Lien 110/22kV station, with a capacity of 2x63MVA. It is expected that in 2015, 01 63MVA transformer will be put into operation first. The 110kV double-circuit power line supplying the station will be connected to the 110kV Hoa Khanh – Hai Van Tunnel line.
Communication system
KCNC will have information technology and communications infrastructure to ensure smooth communication and connection, high-quality transmission lines, confidentiality, safety and network security.
Danang High-Tech Park Infrastructure Completed
Current status of planning and using Long Hau High-Tech Auxiliary Factory
Currently, there are 2 Japanese companies, Hatsuta (location J04-01) and Inaba (location J04-02) renting at Lot J4. Long Hau is continuing to build 2 more factories at locations J4-03 (area 3,226m2) and J04-04 (area 6,048 m2).
Lot J4 floor plan of Long Hau high-tech auxiliary factory
Floor plan of Long Hau high-tech auxiliary factory Lot J04-03&04
Assemblies, spare parts for new energy and renewable energy twf power generation equipment systems;
High-quality plastic parts; Precision transmissions, durable and long-lasting plastic parts, heat-resistant and wear-resistant;
Sensors of all kinds; Gas sensors, acceleration sensors, magnetic sensors; biological sensors, temperature sensors, humidity sensors, light sensors, pressure sensors, …;
New generation motors: Electric motors, magnetic drive motors, servo motors (stepping motors), reluctance motors, linear motors; High precision actuators.
Investment incentives policy
Investment incentives
Industries attracting investment: electronics, automobile parts manufacturing, mechanics and supporting industries for the supporting industry (according to Decree No. 111/2015/ND-CP dated November 3, 2015)
Molds: High-precision molds, high-precision plastic molds; High-quality standard mechanical parts: High-precision nuts, bolts, screws for electronic, mechatronic, medical electronics, industrial robots;
Component assemblies, spare parts for power generation systems from new energy and renewable energy;
High-quality plastic parts: Precision transmissions, durable and long-lasting plastic parts, heat-resistant and wear-resistant;
Sensors of all kinds: Gas sensors, acceleration sensors, magnetic sensors; biological sensors, temperature sensors, humidity sensors, light sensors, pressure sensors….;
New generation motors: Electric motors, magnetic drive motors, servo motors (stepping motors), reluctance motors, linear motors; High-precision actuators.
Security: professional security team 24/7.
Surrounding amenities:
the factory area is located in Da Nang High-Tech Park with full amenities such as shopping malls, universities, etc. Connecting the business community: in Da Nang High-Tech Park and directly connected to the Concentrated Information Technology Park The project is designed to modern standards, solid structure, integrating many functions, meeting the production needs of the high-tech supporting industry.
Tax incentives
Tax incentives at Da Nang High-Tech Park – According to Decree 04/2018/ND-CP effective from February 20, 2018 Corporate income tax incentives.
Images of tax incentives of Long Hau Da Nang high-tech factory
Import tax incentives
Tax exemption for imported goods to create fixed assets of the project;
Tax exemption for imported goods used directly for scientific research and technological development activities;
Tax exemption for a period of 05 years from the date of production for raw materials, supplies and components that cannot be produced domestically.
Planning map of Long Hau High-tech Auxiliary Factory
Image of Long Hau high-tech factory planning
Image of Overall Floor Plan of Factory for rent lot J4
Download high quality file Lot J4: Link
Construction progress of factory J4-03 (details of lot J4-03A & J4-3B)
Time to sign the reservation agreement (MOU): 03/2021 – 04/2021
Time to sign the contract: 04/2021
Sign the contract & hand over the factory: 08/2021
Rent
Factory without office: 3.9 usd/m2/month Factory with office: 4.9 usd/m2/month
Note: Rental price includes VAT and management fee
Payment and deposit method 1st installment: Signing a deposit contract – Paying 6 months of rent 2nd installment: Payment on the 25th of each month
Note: Minimum contract term of 6 years (Fixed rental price for the first 3 years for factory lease contracts, and increasing by 10% in the next 3 years of the factory lease contract unit price.
Investment process Step 1: Quotation & Proposal Step 2: Signing the MOU reservation agreement (J4-3 + J4-4) Step 3: Submitting procedures to request approval of the high-tech industry from the competent authority Step 4: Signing the reservation contract Step 5: Legal procedures (investment certificate + business license) Step 6: Construction (J4-3 + J4-4) Step 7: Sign the lease contract Step 8: Go into operation
Actual image of completed factory at lot J4
Actual image of the factory seen from above
Factory entrance
Outside factory premises
Factory exterior image
Image of office area inside factory
Image inside the factory
Automatic fire protection system
Evaluation of Da Nang High-tech Supporting Factory
Advantage
Factory built with flexible area according to customer needs: from 1,500 m2, including completed office.
Simple and quick approval procedures for supporting industries.
The first supporting technology factory in Da Nang.
Professional project management team with many years of experience.
Standard, modern equipment.
Complete infrastructure.
Disadvantages
The factory is located in the city center, so it is difficult to recruit and transport goods.
There is no factory available, so customers who need a factory immediately will not be able to meet it.
The price is higher than the price of the area.
Services of Vietnam Property Hub
With a team of staff with many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub provides the following services:
Investment promotion (land, factories) in industrial parks, industrial clusters and commercial service land, …
Legal support & Investment consulting in areas related to industrial real estate.
Connecting and cooperating in industrial real estate investment.
Contact consultant
Helen
Property Investment & Advisory Manager15 years experience