With the strong development momentum of Tan Kim Industrial Park in particular or all industrial parks in Can Giuoc in general, this promises to be a place that gathers many development opportunities in the future as well as strongly attracts domestic and foreign investors.
Tan Kim Industrial Park Expansion is an industrial park located in the Southern key economic zone, very close to Can Giuoc Town as well as the developing residential area Phu My Hung. District 7, Ho Chi Minh City – is one of the most potential industrial parks in Long An province
Overview of Tan Kim Industrial Park
By road: Located at the intersection of National Highway 50 at Km13 + 326. Following this route, it is possible to connect with local industrial parks, economic centers and specific provinces and cities as follows:
Regarding waterways: Surrounding the expanded Tan Kim Industrial Park are canals, streams, Can Giuoc River, leading to Soai Rap River, Vam Co River connecting with Ho Chi Minh City and the Mekong Delta provinces specifically as follows:
Location of Tan Kim Industrial Park
Internal traffic system: The road network includes the following routes:
External traffic: Connecting Tan Kim Industrial Park expansion with National Highway 50 and is the main road of the Industrial Park with the largest road width of 55m.
The main road leading to the land is convenient to ensure the smooth transportation of construction materials and goods
Power supply system
Power source and power grid from Can Giuoc 110/22KV transformer station. The power grid is connected from the existing 22KV line along National Highway 50 leading to the project.
Water supply system
Ha Lan Water Supply Company Limited is the direct supplier of clean water to Tan Kim Industrial Park and throughout Can Giuoc district.
Wastewater treatment system
Wastewater is treated at 2 levels:
Level I: Treated separately in each factory before discharging into the wastewater drainage network.
Level II: Treatment at the wastewater treatment plant of the Industrial Park meets QCVN 24: 2009 standards.
Fire prevention and fighting system
Fire prevention and fighting system complies with current regulations of the State.
Postal and telecommunications services
Establishing a modern and complete postal and telecommunications network, capable of synchronous connection with national and international telecommunications networks, communication systems, and high-speed internet transmission lines.
Infrastructure of Tan Kim Industrial Park
The expanded Tan Kim Industrial Park is permitted by the Long An Provincial People’s Committee and the Long An Economic Zone Management Board to receive the following industries:
Current status of land use planning of Tan Kim Industrial Park
With a team of staff with many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub provides the following services:
特别是新金工业园区,或者说芹苴县所有工业园区的强劲发展势头,有望成为未来聚集众多发展机遇的地方,并强烈吸引国内外投资者。
新金工业园区扩建项目位于南部重点经济区,毗邻芹苴镇和富美兴住宅区。该园区位于胡志明市第七郡,是隆安省最具潜力的工业园区之一。
全名:新金工业园区
地址:隆安省芹苴县新金乡新福村
投资者:新金工业园区及住宅区基础设施开发有限公司
总面积:52.41公顷
建筑密度(%):60%
售价:60美元/平方米
建成日期:2015年
运营期限:2065年(自建成之日起50年)
新金工业园区概况
公路:位于50号国道交叉口(13公里+326公里处)。沿此路线可通往以下地方工业园区、经济中心和特定省市:
距离胡志明市平政县:10公里;
距离胡志明市中心:18公里;
距离芹苴市:2公里;
距离边沥:20公里;
距离协福牙贝港:10公里;
距离新山一国际机场:20公里。
水路方面:扩建后的新金工业园区周围有运河、溪流、芹约河,通往索艾拉普河和万古河,连接胡志明市和湄公河三角洲各省。具体如下:
新金工业园位置
内部交通系统:道路网络包含以下路线:
外部交通:连接新金工业园区扩建区与50号国道,是工业园区的主干道,最大宽度为55米。
通往土地的主干道交通便利,确保建筑材料和货物的顺畅运输。
供电系统
电源及电网来自芹苴110/22千伏变电站。电网连接现有22千伏线路,沿50号国道通往项目区。
供水系统
哈兰供水有限公司是新金工业园区及整个芹苴县的直接清洁供水供应商。
污水处理系统
污水处理分为两级:
一级:在各工厂单独处理后排入污水排水管网。
二级:工业园区污水处理厂的处理符合卡塔尔国家污水处理协会 (QCVN) 24: 2009 标准。
消防系统
消防系统符合国家现行规定。
邮电服务
建立现代化、完善的邮电网络,能够与国内外电信网络、通讯系统和高速互联网传输线路同步互联。
新金工业园区基础设施
经隆安省人民委员会和隆安经济区管理委员会批准,扩建的新金工业园区将吸引以下产业入驻:
新金工业园区土地利用规划现状
越南房地产中心拥有一支在项目投资实施领域拥有多年经验的员工队伍,与工业园区管理委员会和项目投资者合作,为众多国内外投资者提供服务,提供以下服务: