Nam Tan Uyen Industrial Park is located in Khanh Binh Ward, Tan Uyen Town, Binh Duong Province. After 20 years of establishment and development, Nam Tan Uyen Binh Duong Industrial Park is now affirming its position as a key industrial cluster attracting investment in Binh Duong Province, helping the province attract many domestic and foreign investors here.
Project name: Nam Tan Uyen Industrial Park
Location: Hamlet 4, Khanh Binh Commune, Tan Uyen District, Binh Duong Province;
Investor: Nam Tan Uyen Industrial Park Joint Stock Company
Scale: 331.97 ha
Occupancy rate: 99.47%
Year of operation: 2005
Land use period: 2054
Nam Tan Uyen Industrial Park is located right on the road intersecting DT 747B and DT 746 in Khanh Binh Ward, Tan Uyen Town, Binh Duong. Nam Tan Uyen Binh Duong Industrial Park has the advantage of being located right in the key economic center of the South.
The project is located at:
Location of Nam Tan Uyen Industrial Park
Technical infrastructure: Complete traffic infrastructure, closed traffic network with harmoniously designed routes to create aesthetics for the industrial park. The road surface is paved with hot asphalt concrete from 14-35m wide, standard load H30. Complete infrastructure of electricity, water, and communication. There are facilities for workers’ housing, Bank
Power supply system: Power system with source 110/220KV – 2×40 MVA (6 main lines + 2 backup lines)
Water supply and drainage system: Clean water plant with capacity of 33,000 cubic meters/day and night.
Wastewater and waste treatment system: Centralized wastewater treatment plant: Total designed capacity 8,000 m3/day and night. Currently, the wastewater treatment plant has put into operation module 1 with a capacity of 2,000 m3/day and night
Telecommunications and internet system: Telecommunication Center located in Nam Tan Uyen Industrial Park, 2,600 connection ports with high-speed ADSL transmission system
Fire prevention and fighting system: Complete
Investment and infrastructure completion status: Complete, flat ground.
Nam Tan Uyen Industrial Park Wastewater Treatment Plant
Nam Tan Uyen Industrial Park with a total area of 331.97 ha.
In which:
Planning map of Nam Tan Uyen Industrial Park phase 1
Mechanical engineering project group: metallurgy, production of tools, spare parts, equipment; production of equipment and machinery for agricultural and industrial production; production of all kinds of automobiles and motorbikes; processing and assembling of special machinery and equipment; casting, rolling and drawing metal;
Food, beverage and food processing project group: processing of vegetables, tubers, fruits, cereals and agricultural products; processing of dairy products, livestock and poultry; seafood processing; industrial catering; confectionery of all kinds; fast food of all kinds, production of beer, soft drinks, all kinds of soft drinks and purified drinking water;
Construction material production project group: concrete components, sewer pipes, foundation treatment wicks; tunnel kiln bricks of all kinds; marble, granite, pigments;
Pharmaceutical and cosmetic project group: production of cosmetics; production of medicines for humans and livestock and poultry (including traditional and modern medicines); production and processing of biological products;
Group of projects on textiles (not dyed) and garments: production of garments, leather (not tanned), imitation leather, production of textile products (not dyed);
Group of other projects: assembly of electronic products, printing, packaging and related services; production of handicrafts, processing of wood and wood products; production of metal components, barrels, tanks and boilers; production of household and high-end plastic and aluminum products; production of paper products and packaging from pulp or used paper; production of technological products; production of children’s toys; Support services for industrial park operations such as office rental, banking, post office, telecommunications, warehouses (including cold storage), warehouse services, transportation, delivery, food supply, transportation, industrial cleaning, collection and transportation of solid waste and hazardous waste to a thorough treatment site outside the industrial park.
Import tax and corporate tax rate applied 21%
100% tax exemption on imported goods such as: machinery – equipment; means of transport and construction materials
Preferential export tax of 10% for the first 15 years and reduced by 50% for the next 9 years.
Planning map of Nam Tan Uyen Industrial Park phase 1
Nam Tan Uyen Industrial Park has great advantages in infrastructure as well as external utilities. It is very convenient for investing in projects with many attractive tax incentives.
Thanks to its favorable geographical location, many supporting industrial parks and industrial clusters are being developed around Nam Tan Uyen Industrial Park. Thanks to that advantage, it is easy to provide the best services for investors such as: preferential investment prices for infrastructure, low labor costs and easy travel to neighboring provinces and cities, etc.
Panorama of Nam Tan Uyen Industrial Park
With a team of staff with many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub provides the following services:
南新渊工业园区位于平阳省新渊镇庆平坊。经过20年的建设和发展,南新渊平阳工业园区现已确立了其作为平阳省重点招商引资产业集群的地位,为平阳省吸引众多国内外投资者提供了助力。
项目名称:南新渊工业园区
地点:平阳省新渊县庆平乡4村
投资方:南新渊工业园区股份公司
规模:331.97公顷
出租率:99.47%
运营年份:2005年
土地使用年限:2054年
南新渊工业园区位于平阳省新渊镇庆平坊DT 747B和DT 746交汇处。南新渊平阳工业园区拥有地处南部重要经济中心的优势。
项目位于:
南新渊工业园区位置
技术基础设施:交通基础设施完善,封闭式交通网络,路线设计和谐,为工业园区增添美感。道路采用热沥青混凝土路面,宽度14-35米,标准荷载H30。电力、水利和通讯基础设施完善。园区设有职工住房、银行等设施。
供电系统:110/220千伏电源系统,2×40兆伏安(6条主线路+2条备用线路)。
供排水系统:净水厂,日处理能力3.3万立方米/日。
污水和废物处理系统:集中式污水处理厂,设计总处理能力8000立方米/日。目前,污水处理厂已投入运行1号模块,处理能力为2000立方米/日/夜。
电信及互联网系统:位于南新渊工业园区的电信中心,拥有2600个连接端口,配备高速ADSL传输系统。
消防系统:已完工。
投资及基础设施完成情况:已完工,地势平坦。
南新渊工业园区污水处理厂
南新渊工业园区总面积331.97公顷。
其中:
南新渊工业园一期规划图
机械工程项目组:冶金,工具、零配件、设备生产;农业和工业生产设备及机械生产;各类汽车和摩托车生产;专用机械设备加工及装配;金属铸造、轧制及拉拔;
食品、饮料及食品加工项目组:蔬菜、块茎、水果、谷物及农产品加工;乳制品、畜禽加工;海产品加工;工业餐饮;各类糖果;各类快餐;啤酒、软饮料、各类软饮料及纯净饮用水生产;
建筑材料生产项目组:混凝土构件、污水管道、地基处理吸水芯;各类隧道窑砖;大理石、花岗岩、颜料;
医药及化妆品项目组:化妆品生产;人用及畜禽用药品(包括传统药品和现代药品)生产;生物制品生产及加工;
纺织品(非染色)和服装项目组:服装生产、皮革(非鞣制)、人造革生产、纺织品(非染色)生产;
其他项目组:电子产品组装、印刷、包装及相关服务;手工艺品生产、木材及木制品加工;金属部件、桶、罐和锅炉生产;家用及高端塑料和铝制品生产;纸制品及纸浆或废纸包装生产;科技产品生产;儿童玩具生产;工业园区运营支持服务,例如办公室租赁、银行、邮局、电信、仓库(包括冷藏)、仓储服务、运输、配送、食品供应、运输、工业清洁、固体废物和危险废物收集及运输至工业园区外的彻底处理场所。
进口税和企业所得税税率均为21%
进口商品(例如:机械设备、运输工具和建筑材料)100%免税
前15年出口税优惠为10%,之后9年减半。
南新渊工业园一期规划图
南新渊工业园区在基础设施和外部配套设施方面拥有巨大优势。园区投资项目便利,并提供多项优惠的税收优惠政策。
南新渊工业园区地理位置优越,周边正在建设许多配套工业园区和产业集群。凭借这一优势,园区能够为投资者提供最佳服务,例如:优惠的基础设施投资价格、低廉的劳动力成本以及便捷的交通,方便前往邻近省市等。
南新渊工业园全景
越南房地产中心拥有一支在项目投资实施领域拥有多年经验的员工队伍,与工业园区管理委员会和项目投资者合作,为众多国内外投资者提供服务,提供以下服务: