VSIP 2A Industrial Park

June 26, 2025

VSIP 2A Tan Uyen Industrial Park, Binh Duong has received the attention of many investors recently. It is undeniable that Binh Duong has the potential for economic development in recent years.

Overview of VSIP 2A Industrial Park project

Project name: VSIP 2A Industrial Park VSIP 2A Tan Uyen Industrial Park, Binh Duong has received the attention of many investors recently. It is undeniable that Binh Duong has great potential for economic development in recent years.

Location: Vinh Tan Ward, Tan Uyen Town and Tan Binh Commune, Bac Tan Uyen District, Binh Duong Province

Investor: Vietnam Singapore Industrial Park Joint Venture Company Limited

Scale: 1,000ha

Occupancy rate: 100%

Year of operation: updating

Land use period: updating

Tổng quan KCN VSIP 2A

VSIP 2A Industrial Park project location

Because VSIP 2A Industrial Park has an extremely favorable and important location in the entire region, the project has many outstanding advantages.

The project belongs to the Binh Duong Industrial, Service and Urban Complex, so it is easy to travel and transport goods. Because it only takes 15km to travel to VSIP 1 Industrial Park in the North, it is quite time-saving.

  • Distance to the nearest major city: 38km to the center of Ho Chi Minh City
  • Distance to the provincial center: 10km to the center of Thu Dau Mot City
  • Distance to the nearest airport: Tan Son Nhat – 38km
  • Distance to the nearest railway station: Saigon Railway Station – 38km
  • Distance to the nearest river port: Cat Lai – 38km
  • Distance to the nearest seaport: Cat Lai – 38km

Vị trí KCN VSIP 2A mở rộng

Location of VSIP 2A Industrial Park expansion

VSIP 2A Industrial Park Infrastructure

VSIP 2A Binh Duong is located in the Binh Duong Industrial, Service and Urban Complex (4,196 hectares), which is planning to build the new Binh Duong city center in the future.

Hard ground, may not need to reinforce piles before building factories.
Altitude above sea level: 25-30m
Climate conditions: average annual temperature is 27.3 degrees Celsius, average humidity is 88%, maximum daily rainfall is 130.0mm

Power supply system: 110/22kv

Water supply and drainage system:

Capacity: 50,000m3/day
The rainwater drainage system is arranged along the roads, professional infrastructure management team.

Hệ thống thoát nước KCN VSIP 2A

Wastewater and waste treatment system

Maximum treatment capacity (m3/day): 41,000m3/day Current wastewater treatment capacity (m3/day): 6,000m3/day

Hệ thống xử lý nước thải KCN VSIP 2A

VSIP 2A Industrial Park Wastewater Treatment System

Telecommunication and Internet systems

Internet: fiber optic cable, maximum bandwidth 2GB

Fire prevention and firefighting systems

Fire hydrants are installed along main and branch roads, fire stations are located in VSIP area.

Investment and infrastructure completion status

Main axis system: 64m Internal traffic system: branch road 24m

Current status of land use planning of VSIP 2A Industrial Park

updating

Priority areas for attracting investment in VSIP 2A Industrial Park

– Automobile assembly & spare parts manufacturing;

– Electrical & electronics;

– Mechanical

– Textiles

– Pharmaceuticals & healthcare;

– Food & beverage;

– Supporting industry & other industries

Investment attraction policy

updating

VSIP 2A Industrial Park planning map

Bản đồ quy hoạch Khu công nghiệp VSIP 2A

VSIP 2A Industrial Park planning map

VSIP 2A Industrial Park Review

Because of its extremely favorable and important location in the entire area, the project has many outstanding advantages.

The project belongs to the Binh Duong Industrial, Service and Urban Complex, so it is easy to travel and transport goods. Because it only takes 15km to move to VSIP 1 Industrial Park in the North direction, it is quite time-saving.

According to the latest update, this location has been planned by the local government to develop the new City Center of Binh Duong province.

Surrounding VSIP 2 Industrial Park are important routes that play an important role in transporting goods. For example, DT741, DT742, and the expressway connecting My Phuoc to Tan Van, from Ring Road 4 cutting across VSIP 2 Industrial Park.

VSIP 2 Industrial Park is built according to the VSIP 1 Industrial Park model, so it meets many strict standards of the world.

Amenities include markets, schools, hospitals, sports grounds, parks, etc. to meet the needs of the people.

Services of Vietnam Property Hub

With a team of staff with many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub provides the following services:

  • Investment promotion (land, factories) in industrial parks, industrial clusters and commercial service land, …
  • Legal support & Investment consulting in areas related to industrial real estate.
  • Connecting and cooperating in industrial real estate investment.

Contact consultant


平阳省VSIP 2A新渊工业区近期受到众多投资者的关注。不可否认,平阳省近年来经济发展潜力巨大。

VSIP 2A工业园区项目概况

项目名称:VSIP 2A 工业园区 平阳省 VSIP 2A 新渊工业园区近年来备受投资者关注。毋庸置疑,平阳省近年来经济发展潜力巨大。

地点:平阳省北新渊县新渊镇永新坊及新平乡

投资者:越南新加坡工业园区合资有限公司

规模:1000 公顷

出租率:100%

运营年限:更新中

土地使用年限:更新中

Tổng quan KCN VSIP 2A

VSIP 2A工业园区项目位置

由于VSIP 2A工业园区在整个区域内拥有极其优越的重要位置,该项目拥有诸多优势。

该项目位于平阳省工业、服务及城市综合体,交通便利,货物运输便利。由于距离北部VSIP 1工业园区仅15公里,因此非常节省时间。

  • 距离最近主要城市:胡志明市中心38公里
  • 距离省中心:土龙木市中心10公里
  • 距离最近机场:新山一机场 – 38公里
  • 距离最近火车站:西贡火车站 – 38公里
  • 距离最近河港:吉莱港 – 38公里
  • 距离最近海港:吉莱港 – 38公里

Vị trí KCN VSIP 2A mở rộng

VSIP 2A工业园区扩建项目位置

VSIP 2A工业园区基础设施

平阳VSIP 2A位于平阳工业、服务业和城市综合体(占地4,196公顷)内,未来将规划建设新的平阳市中心。

地基坚硬,工厂建设前无需加固桩基。
海拔:25-30米
气候条件:年平均气温27.3摄氏度,平均湿度88%,最大日降雨量130.0毫米

供电系统:110/22千伏

供排水系统:

排水能力:5万立方米/天
雨水排放系统沿道路设置,配备专业的基础设施管理团队。

Hệ thống thoát nước KCN VSIP 2A

废水及废弃物处理系统

最大处理能力(立方米/天):41,000立方米/天;当前废水处理能力(立方米/天):6,000立方米/天

Hệ thống xử lý nước thải KCN VSIP 2A

VSIP 2A工业园区污水处理系统

电信和互联网系统

互联网:光纤电缆,最大带宽2GB

消防和灭火系统

主干道和支路均设有消防栓,消防站位于VSIP区域。

投资和基础设施完成情况

主轴线系统:64米;内部交通系统:支路24米

VSIP 2A工业园区土地利用规划现状

updating

VSIP 2A工业园区招商引资重点领域

– 汽车装配及零部件制造;

– 电气电子;

– 机械制造

– 纺织业

– 制药及医疗保健;

– 食品饮料;

– 辅助工业及其他行业

招商引资政策

updating

VSIP 2A工业园区规划图

Bản đồ quy hoạch Khu công nghiệp VSIP 2A

VSIP 2A工业园区规划图

VSIP 2A工业园区审查

该项目地理位置优越,在整个区域内具有诸多优势。

该项目位于平阳省工业、服务及城市综合体,交通便利,货物运输便捷。从北边前往VSIP 1工业园区仅需15公里,节省大量时间。

据最新消息,该地块已被当地政府规划用于建设平阳省的新城市中心。

VSIP 2工业园区周边拥有重要的货运路线,例如DT741、DT742,以及连接美福和新万的高速公路,这些高速公路从横穿VSIP 2工业园区的4号环路延伸而出。

VSIP 2工业园区参照VSIP 1工业园区的模式建设,符合多项国际标准。

园区内配套设施齐全,包括市场、学校、医院、运动场、公园等,以满足居民的需求。

越南房地产中心的服务

越南房地产中心拥有一支在项目投资实施领域拥有多年经验的员工队伍,与工业园区管理委员会和项目投资者合作,为众多国内外投资者提供服务,提供以下服务:

  • 工业园区、产业集群和商业服务用地的招商引资(土地、工厂)……
  • 工业地产相关领域的法律支持和投资咨询。
  • 工业地产投资对接与合作。

联系顾问

Helen
Property Investment & Advisory Manager 15 years experience
Kater
Industrial Property
Consultant
5 years experience