[Tay Ninh] Linh Trung Export Processing Zone

June 17, 2025

Overview of Linh Trung 3 Export Processing Zone project

Linh Trung 3 Export Processing Zone is a joint venture project between Vietnam and China. The Chinese side is China Electric Import-Export Company Limited, the Vietnamese side is Tan Thuan Industrial Development One Member Limited Liability Company. The total investment capital of the project is 65,500,000 USD, the legal capital is 17,000,000 USD, each side contributes 50% of the capital, the total area of ​​the zone is 327.50 hectares. Linh Trung Export Processing Zone includes: Zone I, Zone II and Zone II.

Project name: Linh Trung 3 Export Processing Zone

Location: Suoi Sau Quarter, An Tinh Ward, Trang Bang Town, Tay Ninh, Vietnam

Investor: Sepzone – Linh Trung Joint Venture Company

Scale: 203.8 ha

Start date: December 27, 2002

Project duration: 50 years

Toàn cảnh Khu chế xuất Linh Trung 3

Overview of Linh Trung 3 Export Processing Zone

Location Linh Trung 3 Export Processing Zone

Location Linh Trung 3 Export Processing Zone planned in An Tinh commune, Trang Bang district, Tay Ninh province – Bordering Cu Chi district, Ho Chi Minh city, located next to the Trans-Asia highway.
  • 45 km from Ho Chi Minh City Center, 45 km from Tay Ninh City
  • 42 km from Saigon Port
  • 37 km from Tan Son Nhat International Airport
  • 28 km from Moc Bai International Border Gate, 95 km from Xa Mat International Border Gate.
Convenient for transporting goods to airports, international ports, border gates, serving trade and export of export processing zones.
Vị trí Khu chế xuất Linh Trung 3
Location Linh Trung 3 Export Processing Zone

Infrastructure of Linh Trung 3 Export Processing Zone

Linh trung 3 export processing zone Equipped with international standard infrastructure system including:

Electricity supply:

Electricity supply meets Vietnam standard TCVN1985-1994.

Water supply:

Water supply meets Vietnam standard TC 505/BYT. The water plant has the capacity to supply 15,000m3/day.

Telecommunication system:

There are about 1,500 IDD telephone lines supplying factories in the area.

Wastewater treatment:

Wastewater is preliminarily treated at the factory to meet Industrial Park standards before being discharged from factories and will be centrally treated at the wastewater treatment plant of the area to meet TCVN40:2011/BTNMT standards when discharged into the drainage system outside the area. The wastewater treatment plant has the capacity to treat 10,000m3/day.

Internal roads:
The internal road system is paved with hot asphalt concrete and designed according to VN standard H18-H30.

Current status of land use planning of Linh Trung III Export Processing Zone

Linh Trung III Export Processing Zone started infrastructure construction in May 2003. Currently, compensation and site clearance work has been completed, more than 90% of the total infrastructure construction work has been completed, and approximately more than 125 hectares of land are ready for lease.

Bản đồ quy hoạch dự án KCX Linh Trung III
Planning map of Linh Trung III Export Processing Zone project

Priority areas for investment attraction

Linh Trung 3 Export Processing Zone selects, prioritizes and encourages enterprises with high-tech machinery content, limiting the attraction of enterprises with outdated machinery, at risk of causing environmental pollution and labor-intensive.

Investment incentives policy

No VAT applied to export processing enterprises.

Exemption from export tax during the project implementation period

Exemption from tax for 2 years and 50% reduction of tax payable for the next 4 years.

Apply corporate income tax rate of 17%: for the first 10 years from the time the enterprise starts production / operation.

In addition, depending on the main business line registered by the Investor, the Investor will consider applying for approval to enjoy corporate income tax incentives at different levels. For details, investors need to contact legal consultants and land lawyers to be updated on the latest preferential policies of Tay Ninh province for industrial parks and export processing zones.

Linh Trung III Export Processing Zone Planning Map

Download high quality file of industrial park planning map: Link

Evaluation of Linh Trung III Export Processing Zone

The export processing zone is located close to the border of Tay Ninh province and Ho Chi Minh city, to the northwest of the city, 37 km from Tan Son Nhat international airport, 42 km from Saigon port, with an altitude of 5-8m above sea level, flat and solid land, convenient road traffic is an ideal location for domestic and foreign investors to choose to develop their businesses.

Services of Vietnam Property Hub

With a team of staff with many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub provides the following services:
  • Investment promotion (land, factories) in industrial parks, industrial clusters and commercial service land, …
  • Legal support & Investment consulting in areas related to industrial real estate.
  • Connecting and cooperating in industrial real estate investment.

Contact consultant

 

 


灵忠3出口加工区项目概况

灵忠三号出口加工区是中越合资项目。中方为中国电气进出口有限公司,越方为新顺工业发展一人有限责任公司。项目总投资额为6550万美元,法定资本为1700万美元,双方各占50%,园区总面积为327.50公顷。灵忠出口加工区分为:一区、二区和三区。

项目名称:灵忠3号出口加工区

地址:越南西宁省庄榜镇安静坊水秀区

投资方:Sepzone – 灵忠合资公司

规模:203.8公顷

开工日期:2002年12月27日

项目工期:50年

Toàn cảnh Khu chế xuất Linh Trung 3

灵忠3出口加工区概况

灵忠3出口加工区位置

灵忠3号出口加工区位于西宁省庄鹏县安静乡,毗邻胡志明市古芝县,毗邻泛亚公路。
距胡志明市中心45公里,距西宁市45公里
距西贡港42公里
距新山一国际机场37公里
距木牌国际口岸28公里,距沙末国际口岸95公里。
该区域交通便利,可方便货物运输至机场、国际港口、口岸,为出口加工区的贸易和出口提供服务。
Vị trí Khu chế xuất Linh Trung 3
灵忠3出口加工区位置

灵忠3出口加工区的基础设施

灵忠3出口加工区配备国际标准的基础设施体系,包括:

电力供应:

电力供应符合越南TCVN1985-1994标准。

供水:

供水符合越南TC 505/BYT标准。水厂日供水能力为15,000立方米。

电信系统:

该地区约有1,500条国际直拨电话线路为工厂供电。

废水处理:

废水在工厂内进行初步处理,达到工业园区排放标准后方可排放。废水经区域污水处理厂集中处理,达到TCVN40:2011/BTNMT标准后,再排入区域外的排水系统。污水处理厂的处理能力为10,000立方米/天。

内部道路:
内部道路系统采用热沥青混凝土铺设,并按照越南国家标准H18-H30进行设计。

灵忠三出口加工区土地利用规划现状

灵中三出口加工区于2003年5月开始基础设施建设。目前,补偿和场地清理工作已完成,基础设施建设总量已完成90%以上,约125多公顷土地可供租赁。

Bản đồ quy hoạch dự án KCX Linh Trung III
灵忠三出口加工区项目规划图

招商引资重点领域

灵忠3出口加工区选择、优先和鼓励拥有高科技机械含量的企业,限制吸引机械落后、有造成环境污染风险和劳动密集型的企业。

投资激励政策

出口加工企业免征增值税。

项目实施期间免征出口税

2年免税,之后4年应纳税额减半。

自企业开始生产/运营之日起,前10年适用17%的企业所得税税率。

此外,根据投资者注册的主营业务,投资者可考虑申请享受不同级别的企业所得税优惠。投资者需联系法律顾问和土地律师,了解西宁省工业园区和出口加工区的最新优惠政策。

灵忠三出口加工区规划图

下载工业园区规划图高清文件: Link

灵忠三出口加工区评估

出口加工区位于西宁省与胡志明市边境附近,位于该市西北部,距新山一国际机场37公里,距西贡港42公里,海拔5-8米,土地平坦坚实,公路交通便利,是国内外投资者选择发展业务的理想地点。

越南房地产中心的服务

越南房地产中心拥有一支在项目投资实施领域拥有多年经验的员工队伍,与工业园区管理委员会、项目投资者合作,为众多国内外投资者提供服务,提供以下服务:
  • 工业园区、产业集群和商业服务用地的招商引资(土地、工厂)……
  • 工业地产相关领域的法律支持和投资咨询。
  • 工业地产投资对接与合作。