Project name: VSIP 2 Industrial Park
Investor: Vietnam – Singapore Industrial Park Joint Venture Company Limited
Location: Thong Nhat Avenue – Tran Quoc Toan – Le Loi, Tan Uyen Ward, Binh Duong City, Binh Duong Province
Scale: 2,045 hectares. Including 2 phases:
Phase 1: includes 345 hectares. Total investment capital: 1.3 billion USD
Phase 2: includes 1,700 hectares. Estimated investment capital: 2 billion USD
Actual image of VSIP 2 industrial park.
VSIP 2 Industrial Park is located at Thong Nhat Avenue – Tran Quoc Toan – Le Loi, Tan Uyen Ward, Binh Duong City, Binh Duong Province, adjacent to My Phuoc 1-2-3 Industrial Park and Dong An Industrial Park… This is a strategic location, with synchronous infrastructure and a modern transportation system convenient for moving and trading goods in the area.
VSIP 2 industrial park project location
VSIP II Industrial Park is built according to the model of VSIP 1 (Singapore standard: Green – clean – beautiful) with modern infrastructure meeting international standards, professional with full range of industries such as: industry, trade – services, residential… The industrial park is designed by the investor according to a modern model according to the general architecture with full available utilities such as: market, school, hospital, park… right in the project, serving all the essential needs of residents living and working here.
The main axis system is 28m wide, including 4 lanes.
The internal axis traffic system is 18m wide, including 2 lanes.
Electricity: Power supply from the 22 Kv National grid, with capacity: 140 MW/day, ensuring 24/24h power supply.
Water: The water supply network is a ring network that ensures water supply to each plot of land through 2 pumping stations with a total flow of more than 70,000m3/day.
Communication: There is a complete communication system to ensure more convenient domestic and international communication. The communication system includes telephone, mobile phone, Fax, Internet … Service implementation time is within 7-10 days.
Wastewater treatment system: Wastewater treatment plant with a capacity of 6,000m3/day and will be upgraded in phase 2 to 40,000m3/day in the near future. Thereby, ensuring waste treatment standards according to regulations of the Ministry of Natural Resources and Environment
Image of internal road VSIP 2
VSIP II has completed infrastructure construction, filling about 99% of the industrial park area, attracting nearly 340 industrial projects, creating jobs for about 60,000 workers with a total investment capital of about 5 billion USD.
Tax incentives: 2-year tax exemption, 50% reduction for the next 4 years for new investment projects
Updating
Advantages:
Disadvantages:
The price is higher than other industrial parks.
项目名称:VSIP 2 工业园区
投资方:越南-新加坡工业园区合资有限公司
地址:平阳省平阳市新渊坊统一大道-镇国全-黎利路
规模:2,045 公顷。分为两期:
一期:占地 345 公顷。总投资额:13 亿美元
二期:占地 1,700 公顷。预计投资额:20 亿美元
VSIP 2 工业园区的实际图像。
VSIP 2工业园区位于平阳省平阳市新渊坊统一大道-镇国全-黎利路,毗邻美福1-2-3工业园区和同安工业园区……地理位置优越,基础设施齐备,交通运输便利,为区域内货物流通和贸易提供了便利。
VSIP 2工业园区项目位置
VSIP II 工业园区参照 VSIP 1 工业园区的模式建设(新加坡标准:绿色 – 清洁 – 美丽),拥有符合国际标准的现代化基础设施,专业化程度高,产业门类齐全,涵盖工业、贸易、服务业、住宅等。该工业园区由投资者根据总体建筑风格,采用现代化模式设计,配套设施齐全,例如市场、学校、医院、公园等,满足居民生活和工作的所有基本需求。
主轴线系统宽 28 米,共 4 条车道。
内轴交通系统宽 18 米,共 2 条车道。
电力:由 22 千伏国家电网供电,日发电量 140 兆瓦,确保全天候供电。
供水:供水管网为环形管网,通过 2 个泵站向每个地块供水,总流量超过 70,000 立方米/天。
通讯:完善的通讯系统确保国内外通讯更加便捷。通讯系统包括电话、手机、传真、互联网等。服务实施时间为7-10天。
污水处理系统:污水处理厂的处理能力为6000立方米/天,并将在二期升级至40000立方米/天。从而确保废物处理符合自然资源与环境部的规定。
VSIP 2 内部道路图片
VSIP二期已完成基础设施建设,工业区面积覆盖率达99%,吸引近340个工业项目,创造约6万个就业机会,总投资额约50亿美元。
税收优惠:新投资项目2年免税,未来4年减半
Updating
优势:
信誉卓著的投资者,在越南工业园区开发和管理领域拥有多年经验。
现代化、同步的基础设施,符合绿色标准的优质服务,以及一支安保团队和高素质员工队伍。
热情地为投资者提供支持,并轻松解答疑问。
优越的地理位置,方便投资者开展生产经营活动。
同步的城市和工业园区开发模式,旨在为在此工作的专家和员工提供最佳的生活质量。
劣势:
价格高于其他工业园区。