VSIP 2 Industrial Park

May 16, 2025

Overview of VSIP 2 Industrial Park Project

Project name: VSIP 2 Industrial Park

Investor: Vietnam – Singapore Industrial Park Joint Venture Company Limited

Location: Thong Nhat Avenue – Tran Quoc Toan – Le Loi, Tan Uyen Ward, Binh Duong City, Binh Duong Province

Scale: 2,045 hectares. Including 2 phases:

Phase 1: includes 345 hectares. Total investment capital: 1.3 billion USD
Phase 2: includes 1,700 hectares. Estimated investment capital: 2 billion USD

hinh-anh-thuc-te-khu-cong-nghiep-vsip-2

Actual image of VSIP 2 industrial park.

Location of VSIP 2 industrial park

VSIP 2 Industrial Park is located at Thong Nhat Avenue – Tran Quoc Toan – Le Loi, Tan Uyen Ward, Binh Duong City, Binh Duong Province, adjacent to My Phuoc 1-2-3 Industrial Park and Dong An Industrial Park… This is a strategic location, with synchronous infrastructure and a modern transportation system convenient for moving and trading goods in the area.

  • About 40 km from the center of Ho Chi Minh City
  • About 39 km from Tan Son Nhat International Airport – Ho Chi Minh City
  • About 45 km from Thong Nhat Saigon Station
  • About 47 km from Saigon Port
  • About 15 km from VSIP I Industrial Park

vi-tri-khu-cong-nghiep-vsip-2

VSIP 2 industrial park project location

VSIP 2 Industrial Park Infrastructure

VSIP II Industrial Park is built according to the model of VSIP 1 (Singapore standard: Green – clean – beautiful) with modern infrastructure meeting international standards, professional with full range of industries such as: industry, trade – services, residential… The industrial park is designed by the investor according to a modern model according to the general architecture with full available utilities such as: market, school, hospital, park… right in the project, serving all the essential needs of residents living and working here.

The main axis system is 28m wide, including 4 lanes.

The internal axis traffic system is 18m wide, including 2 lanes.

Electricity: Power supply from the 22 Kv National grid, with capacity: 140 MW/day, ensuring 24/24h power supply.

Water: The water supply network is a ring network that ensures water supply to each plot of land through 2 pumping stations with a total flow of more than 70,000m3/day.

Communication: There is a complete communication system to ensure more convenient domestic and international communication. The communication system includes telephone, mobile phone, Fax, Internet … Service implementation time is within 7-10 days.

Wastewater treatment system: Wastewater treatment plant with a capacity of 6,000m3/day and will be upgraded in phase 2 to 40,000m3/day in the near future. Thereby, ensuring waste treatment standards according to regulations of the Ministry of Natural Resources and Environment

duong-noi-bo-vsip-2

Image of internal road VSIP 2

Current status of land use planning of VSIP 2 Industrial Park

VSIP II has completed infrastructure construction, filling about 99% of the industrial park area, attracting nearly 340 industrial projects, creating jobs for about 60,000 workers with a total investment capital of about 5 billion USD.

Priority areas for investment attraction

  • Automobile assembly and spare parts manufacturing industry;
  • Mechanical, electrical and electronic industry;
  • Textile industry;
  • Pharmaceutical and health care products industry;
  • Food and beverage industry;
  • Supporting industry and many other industries.

Investment incentives policy

Tax incentives: 2-year tax exemption, 50% reduction for the next 4 years for new investment projects

Project planning map

Updating

VSIP 2 Industrial Park Review

Advantages:

  • Reputable investor with many years of experience in the field of development and management of industrial parks in Vietnam.
  • Modern, synchronous infrastructure with good quality meeting green standards, along with a team of security guards and quality staff.
  • Enthusiastic support for investors and comfortable resolution of questions.
  • Strategic location helps investors conveniently develop their production and business activities.
  • The synchronous urban and industrial park development model should help experts and employees working here have the best quality of life.

Disadvantages:

The price is higher than other industrial parks.


VSIP 2 工业园区项目概况

项目名称:VSIP 2 工业园区

投资方:越南-新加坡工业园区合资有限公司

地址:平阳省平阳市新渊坊统一大道-镇国全-黎利路

规模:2,045 公顷。分为两期:

一期:占地 345 公顷。总投资额:13 亿美元
二期:占地 1,700 公顷。预计投资额:20 亿美元

hinh-anh-thuc-te-khu-cong-nghiep-vsip-2

VSIP 2 工业园区的实际图像。

VSIP 2工业园区位置

VSIP 2工业园区位于平阳省平阳市新渊坊统一大道-镇国全-黎利路,毗邻美福1-2-3工业园区和同安工业园区……地理位置优越,基础设施齐备,交通运输便利,为区域内货物流通和贸易提供了便利。

  • 距离胡志明市中心约40公里
  • 距离胡志明市新山一国际机场约39公里
  • 距离西贡统一火车站约45公里
  • 距离西贡港约47公里
  • 距离VSIP 1工业园区约15公里

vi-tri-khu-cong-nghiep-vsip-2

VSIP 2工业园区项目位置

VSIP 2工业园区基础设施

VSIP II 工业园区参照 VSIP 1 工业园区的模式建设(新加坡标准:绿色 – 清洁 – 美丽),拥有符合国际标准的现代化基础设施,专业化程度高,产业门类齐全,涵盖工业、贸易、服务业、住宅等。该工业园区由投资者根据总体建筑风格,采用现代化模式设计,配套设施齐全,例如市场、学校、医院、公园等,满足居民生活和工作的所有基本需求。

主轴线系统宽 28 米,共 4 条车道。

内轴交通系统宽 18 米,共 2 条车道。

电力:由 22 千伏国家电网供电,日发电量 140 兆瓦,确保全天候供电。

供水:供水管网为环形管网,通过 2 个泵站向每个地块供水,总流量超过 70,000 立方米/天。

通讯:完善的通讯系统确保国内外通讯更加便捷。通讯系统包括电话、手机、传真、互联网等。服务实施时间为7-10天。

污水处理系统:污水处理厂的处理能力为6000立方米/天,并将在二期升级至40000立方米/天。从而确保废物处理符合自然资源与环境部的规定。

duong-noi-bo-vsip-2

VSIP 2 内部道路图片

VSIP 2 工业园区土地利用规划现状

VSIP二期已完成基础设施建设,工业区面积覆盖率达99%,吸引近340个工业项目,创造约6万个就业机会,总投资额约50亿美元。

招商引资重点领域

  • 汽车装配及零部件制造业;
  • 机械、电气和电子工业;
  • 纺织工业;
  • 医药及保健品工业;
  • 食品饮料工业;
  • 配套工业等众多行业。

投资激励政策

税收优惠:新投资项目2年免税,未来4年减半

项目规划图

Updating

VSIP 2 工业园区回顾

优势:

信誉卓著的投资者,在越南工业园区开发和管理领域拥有多年经验。
现代化、同步的基础设施,符合绿色标准的优质服务,以及一支安保团队和高素质员工队伍。
热情地为投资者提供支持,并轻松解答疑问。
优越的地理位置,方便投资者开展生产经营活动。
同步的城市和工业园区开发模式,旨在为在此工作的专家和员工提供最佳的生活质量。

劣势:

价格高于其他工业园区。

Helen
Property Investment & Advisory Manager 15 years experience
Kater
Industrial Property
Consultant
5 years experience